Menard, TX interconnection queue

2 active projects totalling 294.8 MW in the ERCOT queue.

2active projects
294.8active MW
2total filed
Queue IDProjectkVMWResourceStatus
24INR0386 Black & Gold Energy Storage 138 203.8 Battery SS Completed, FIS Started, IA
27INR0241 Callan Solar 69 91 Solar SS Completed, FIS Started, No IA

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with ERCOT before relying on these figures.