Bow Wood
Named in 2 listed projects in ERCOT’s transmission project tracking workbook, in McCulloch County. First named in the release with data as of June 1, 2017.
Expansion at an existing substation: named load connected. The quoted wording describes a named load being connected at this substation. “interconnection for a large load at Bow Wood Substation” — project 100163, as the utility reported it
No HIFLD substation record has this name in this county.
Generation interconnection requests filed in McCulloch, TX: ERCOT queue, 3 active of 3. Same county, not the same substation.
Projects naming this substation
As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| Provide 345 kV POD to customer via POI from LCRA's Bow Wood 345 kV Switch ERCOT project 100078 · utility no. R6476 |
ONCOR Tier 4 |
Planned Future tab |
345 | May 2028 | Mikeska to Bow Wood McCulloch County |
Mikeska, Bow Wood |
| BowWood_Load_Circuit_Breaker_Addition Install a new transmission point of interconnection for a large load at Bow Wood Substation. ERCOT project 100163 |
LCRATSC Tier 4 |
Planned Future tab |
345 | Dec 2029 | Bow Wood to Bow Wood McCulloch County |
Bow Wood |
Changes between releases
Where two consecutive releases print different values for these projects (last ten releases).
| Release (data as of) | Project | What changed | Printed values |
|---|---|---|---|
| February 1, 2026 | 100163 | Projected in-service date | May 2028 → Dec 2029 |
| October 1, 2025 | 100078 | First listed | on the Future tab |
| October 1, 2025 | 100163 | First listed | on the Future tab |
Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.
Before relying on any of this
- TPIT lists substation work only where it changes a transmission line or autotransformer rating. A new load-serving substation that changes no rating may never appear in it.
- Every value is the Transmission Service Provider's own statement, compiled by ERCOT. Status and in-service dates are not ERCOT determinations.
- The workbook tab (Future, Current-year planned, Completed, Cancelled) is assigned by ERCOT from dates; the status column is the TSP's word. The two can disagree, and both are shown.
- In ERCOT's competitive areas the company named is the transmission and distribution wires company, not a retail electricity provider or a generator.
- ERCOT publishes the workbook about three times a year, plus occasional updates. A substation that is not listed may simply not be reported yet.
- Substation names are read from the workbook's "from" and "to" terminal columns; for rows with neither, from fixed patterns in the title and description. No language model reads this workbook.
- An entry is a name within a county, not a verified physical facility. A link to a HIFLD record means the names and counties agree exactly, not that the two are confirmed to be one facility.