Sunglow
Named in 1 listed project in ERCOT’s transmission project tracking workbook, in Maverick County. First named in the release with data as of February 1, 2024.
Described as new. The quoted wording calls this substation new. “new 138-kV Sunglow Substation” — project 73895 description, as the utility reported it
Reported complete. Project 73895 is on the Completed tab (actual in-service 2025-03), as the utility reported it. That indicates the substation may now be built; it is not a confirmation.
No HIFLD substation record has this name in this county.
Generation interconnection requests filed in Maverick, TX: ERCOT queue, 8 active of 8. Same county, not the same substation.
Location
Maverick County, TX
County only. A source prints the county; no point is published. This is where planning documents put the substation, not a surveyed or built site, and a planned site can move.
How it was located: No point. TPIT says only that the station sits between LCRA TSC T627 and Rio Grande Electric Cooperative's Rosita Creek Substation (OSM way 20841019, 28.6992,-100.4051); it does not name T627's other end, so the line cannot be bounded. No utility page, PUCT filing or OSM feature named Sunglow was found.
Note: TPIT 73895 is on the Completed tab with ISD 2025-03 (status still 'Planned'), so the station may already be in service. TPIT calls Rosita Creek an LCRA substation; OSM tags it Rio Grande Electric Cooperative.
Sources: ERCOT TPIT, project(s) 73895 (release 39, 2026-10-01) · OpenStreetMap: Rosita Creek Substation (way 20841019) (OSM extract 2026-11-20). Map data © OpenStreetMap contributors, available under the Open Database License. Researched by Substation Scout; checked November 21, 2026.
Projects naming this substation
As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| Sunglow Substation Addition This project provides a point of interconnection for a new battery energy storage resource at a new 138-kV Sunglow Substation between LCRA TSC T627 and LCRA Rosita Creek Substation. ERCOT project 73895 |
LCRATSC Tier 4 |
Planned Completed tab |
138 | Mar 2025 actual 2025-03 |
Sunglow Maverick County |
Sunglow |
Changes between releases
Where two consecutive releases print different values for these projects (last ten releases).
| Release (data as of) | Project | What changed | Printed values |
|---|---|---|---|
| June 1, 2025 | 73895 | Moved between tabs | Future → Completed |
| February 1, 2025 | 73895 | Projected in-service date | Jan 2025 → Mar 2025 |
| October 1, 2024 | 73895 | Projected in-service date | Oct 2026 → Jan 2025 |
Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.
Before relying on any of this
- TPIT lists substation work only where it changes a transmission line or autotransformer rating. A new load-serving substation that changes no rating may never appear in it.
- Every value is the Transmission Service Provider's own statement, compiled by ERCOT. Status and in-service dates are not ERCOT determinations.
- The workbook tab (Future, Current-year planned, Completed, Cancelled) is assigned by ERCOT from dates; the status column is the TSP's word. The two can disagree, and both are shown.
- In ERCOT's competitive areas the company named is the transmission and distribution wires company, not a retail electricity provider or a generator.
- ERCOT publishes the workbook about three times a year, plus occasional updates. A substation that is not listed may simply not be reported yet.
- Substation names are read from the workbook's "from" and "to" terminal columns; for rows with neither, from fixed patterns in the title and description. No language model reads this workbook.
- An entry is a name within a county, not a verified physical facility. A link to a HIFLD record means the names and counties agree exactly, not that the two are confirmed to be one facility.