Substation Scout

Border

Named in 3 listed projects in ERCOT’s transmission project tracking workbook, in Loving County. First named in the release with data as of October 1, 2023.

Lovingcounty as printed
138, 345kV
ONCORutility
3projects listed

Described as new. The quoted wording calls this substation new. “new Border 345/138-kV substation” — project 99020 description, as the utility reported it

Reported complete. Project 76690 is on the Completed tab (actual in-service 2025-12), as the utility reported it. That indicates the substation may now be built; it is not a confirmation.

Also printed as: Border Switch

No HIFLD substation record has this name in this county.

Generation interconnection requests filed in Loving, TX: ERCOT queue, 2 active of 2. Same county, not the same substation.

Location

31.9156, -103.6443 · Loving County, TX · view on a map

Read off a planning map. Read off a planning map by matching it to roads and other mapped features. Accurate to about ±400 m, as estimated by the research. This is where planning documents put the substation, not a surveyed or built site, and a planned site can move.

How it was located: Symbol anchored: the orange 'Project Endpoint' circle labelled 'BORDER SWITCH' on Oncor's Drill Hole Switch to Border Switch 345 kV project map (Exhibit 1). Read at 200 dpi (circle centroid px 1617.3,656.1) with a four-point affine fit: where the Culberson / Reeves county line meets the New Mexico state line (Census TIGER 32.0001,-104.02451), where the Reeves / Loving line (Pecos River) meets it (32.00012,-103.98018), where RM 652 crosses it (OSM way 147529587, 32.0002,-103.7197), and the Orla star (OSM place node, 31.8250,-103.9090). Residuals under 15 m; scale ~34.5 m/px, isotropic. The circle is ~1.5 km across on the map, so the point is its centre, +/- ~400 m.

Note: TPIT 76690 ('Add Atchison POD', Completed tab, in service 2025-12, 7 mi of new line) already names 'Border Switch' as its from-terminal, so a Border switch may already exist at 138 kV; the 345/138 kV substation (99020) is planned for 2028-12. Three PUCT dockets (57837, 58050, 58126) all terminate new 345 kV lines at the planned Border Switch.

Sources: Oncor, Drill Hole Switch to Border Switch 345 kV Transmission Line Project map (Exhibit 1) (2025), p.1 · PUCT Docket 57837, Notice of Approval: Border Switch - Quarry Field Switch 345-kV line, Loving County (2025), p.2, finding 12 · PUCT Docket 58050, Notice of Approval: Drill Hole switch-to-Border switch 345-kV line (2025), finding 17 · PUCT Docket 58126, Notice of Approval: Border switch-to-Clearfork switch 345-kV line (2025-2026), finding 11 · ERCOT TPIT, projects 76690, 99020, 99022 (release 39, 2026-10-01) · OpenStreetMap: RM 652, Orla, Quarry Field Switching Station; Census TIGERweb county boundaries (OSM base 2026-11-20). Map data © OpenStreetMap contributors, available under the Open Database License. Researched by Substation Scout; checked November 21, 2026.

Projects naming this substation

As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.

ProjectUtilityStatus as reportedkVProjected in serviceTerminalsSubstations named
Add Atchison POD
ERCOT project 76690 · utility no. R8698 R8726
ONCOR
Tier 4
In-Service
Completed tab
138 Dec 2025
actual 2025-12
Border Switch to Atchison
Loving County
Border Switch, Atchison
Border 345/138 kV Switch and two new 345/138 kV Autotransformers
Add Permian Basin Reliability Plan Upgrade ID L2A Establish a new Border 345/138-kV substation and install two new 345/138-kV transformers
ERCOT project 99020 · utility no. PB_L2_A_B
ONCOR
Tier 3
Planned
Future tab
345 Dec 2028 Border to Border
Loving County
Border
Border - Quarry Field 345 kV double-circuit line
Add Permian Basin Reliability Plan Upgrade ID L2C Add a new Border - Quarry Field 345-kV double-circuit line
ERCOT project 99022 · utility no. PB_L2_C
ONCOR
Tier 2
Planned
Future tab
345 Jun 2028 Border to Quarry Field
Loving County
Border, Quarry Field

Changes between releases

Where two consecutive releases print different values for these projects (last ten releases).

Release (data as of)ProjectWhat changedPrinted values
February 1, 202676690Moved between tabsCurrent-year planned → Completed
February 1, 202676690Status as reportedPlanned → In-Service
February 1, 202676690Projected in-service dateJul 2025 → Dec 2025
October 1, 202576690Projected in-service dateJun 2025 → Jul 2025
October 1, 202599020First listedon the Future tab
October 1, 202599022First listedon the Future tab
June 1, 202576690Moved between tabsFuture → Current-year planned
June 1, 202576690Projected in-service dateApr 2025 → Jun 2025
October 1, 202476690Projected in-service dateDec 2024 → Apr 2025

Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.