Orange Grove
Named in 1 listed project in ERCOT’s transmission project tracking workbook, in Jim Wells County, plus 1 on its Cancelled tab. First named in the release with data as of February 1, 2015.
Jim Wellscounty as printed
138kV
STECutility
1projects listed
No HIFLD substation record has this name in this county.
Generation interconnection requests filed in Jim Wells, TX: ERCOT queue, 5 active of 6. Same county, not the same substation.
Projects naming this substation
As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| Adds new Talitha substation and short line from Talitha to Orange Grove 138 ERCOT project 71954 |
STEC Tier 4 |
In-Service Completed tab |
138 | Apr 2025 actual 2025-04 |
Orange Grove to Talitha Jim Wells County |
Orange Grove, Talitha |
On the Cancelled tab
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| Move Orange Grove load to 138 kV bus Move load from the 69 KV to the 138 KV instead of replacing auto. 2015 RTP ERCOT project 5220 |
STEC Tier 4 |
Conceptual Cancelled tab |
138 | Jun 2031 | Orange Grove Jim Wells County |
Orange Grove |
Changes between releases
Where two consecutive releases print different values for these projects (last ten releases).
| Release (data as of) | Project | What changed | Printed values |
|---|---|---|---|
| October 1, 2025 | 71954 | Status as reported | Under Construction → In-Service |
| June 1, 2025 | 71954 | Moved between tabs | Future → Completed |
| February 1, 2025 | 71954 | Status as reported | Planned → Under Construction |
| February 1, 2025 | 71954 | Projected in-service date | Dec 2024 → Apr 2025 |
Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.
Before relying on any of this
- TPIT lists substation work only where it changes a transmission line or autotransformer rating. A new load-serving substation that changes no rating may never appear in it.
- Every value is the Transmission Service Provider's own statement, compiled by ERCOT. Status and in-service dates are not ERCOT determinations.
- The workbook tab (Future, Current-year planned, Completed, Cancelled) is assigned by ERCOT from dates; the status column is the TSP's word. The two can disagree, and both are shown.
- In ERCOT's competitive areas the company named is the transmission and distribution wires company, not a retail electricity provider or a generator.
- ERCOT publishes the workbook about three times a year, plus occasional updates. A substation that is not listed may simply not be reported yet.
- Substation names are read from the workbook's "from" and "to" terminal columns; for rows with neither, from fixed patterns in the title and description. No language model reads this workbook.
- An entry is a name within a county, not a verified physical facility. A link to a HIFLD record means the names and counties agree exactly, not that the two are confirmed to be one facility.
Site Scanner