Alice
Named in 2 listed projects in ERCOT’s transmission project tracking workbook, in Jim Wells County. First named in the release with data as of June 1, 2017.
Jim Wellscounty as printed
138kV
AEP TCCutility
2projects listed
No HIFLD substation record has this name in this county.
Generation interconnection requests filed in Jim Wells, TX: ERCOT queue, 5 active of 6. Same county, not the same substation.
Projects naming this substation
As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| Alice to Falfurrias: Convert to 138 kV Convert Alice to Falfurrias to 138 Kv opertions and Build Alice, North Ella, and Premont to 138 kV standard ERCOT project 104082 · utility no. TP2026020 · RPG 25RPG045 |
AEP TCC Tier 3 |
Planned Future tab |
138 | Apr 2029 | Alice to Falfurrias Jim Wells / Brooks County |
Alice, Falfurrias |
| Alice to Kingsville 138 kV Line Rebuild Rehab the Alice to Kingsville 138 kV line ERCOT project 64065 · utility no. TA2021079 |
AEP TCC Tier 4 |
Conceptual Future tab |
138 | May 2031 | Alice to Kingsville Jim Wells / Kleberg County |
Alice, Kingsville |
Changes between releases
Where two consecutive releases print different values for these projects (last ten releases).
| Release (data as of) | Project | What changed | Printed values |
|---|---|---|---|
| June 1, 2026 | 104082 | First listed | on the Future tab |
| June 1, 2025 | 64065 | Projected in-service date | May 2030 → May 2031 |
| February 1, 2025 | 64065 | Projected in-service date | May 2029 → May 2030 |
| June 1, 2024 | 64065 | Status as reported | Planned → Conceptual |
| June 1, 2024 | 64065 | Projected in-service date | May 2027 → May 2029 |
Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.
Before relying on any of this
- TPIT lists substation work only where it changes a transmission line or autotransformer rating. A new load-serving substation that changes no rating may never appear in it.
- Every value is the Transmission Service Provider's own statement, compiled by ERCOT. Status and in-service dates are not ERCOT determinations.
- The workbook tab (Future, Current-year planned, Completed, Cancelled) is assigned by ERCOT from dates; the status column is the TSP's word. The two can disagree, and both are shown.
- In ERCOT's competitive areas the company named is the transmission and distribution wires company, not a retail electricity provider or a generator.
- ERCOT publishes the workbook about three times a year, plus occasional updates. A substation that is not listed may simply not be reported yet.
- Substation names are read from the workbook's "from" and "to" terminal columns; for rows with neither, from fixed patterns in the title and description. No language model reads this workbook.
- An entry is a name within a county, not a verified physical facility. A link to a HIFLD record means the names and counties agree exactly, not that the two are confirmed to be one facility.