Hickory

Named in 1 listed project in ERCOT’s transmission project tracking workbook, in Jackson County. First named in the release with data as of June 1, 2026.

Jacksoncounty as printed
345kV
CPS/NOutility
1projects listed

Described as new. The quoted wording calls this substation new. “New Hickory 345kV Switchyard” — project 59959 title, as the utility reported it

Reported complete. Project 59959 is on the Completed tab (actual in-service 2026-05), as the utility reported it. That indicates the substation may now be built; it is not a confirmation.

No HIFLD substation record has this name in this county (a record of the same name exists in another county).

Generation interconnection requests filed in Jackson, TX: ERCOT queue, 6 active of 6. Same county, not the same substation.

Location

Jackson County, TX

County only. A source prints the county; no point is published. This is where planning documents put the substation, not a surveyed or built site, and a planned site can move.

Note: Already in service: TPIT 59959 is on the Completed tab, actual 2026-05. Rename: TPIT calls it 'New Hickory 345kV Switchyard' ('Build a new New Hickory 345 switchyard'), so the station's name may be 'New Hickory' rather than 'Hickory'.

Sources: ERCOT TPIT, project 59959 (release 39, 2026-10-01), sheet CompletedTPIT100126NoCost. Researched by Substation Scout; checked November 21, 2026.

Projects naming this substation

As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.

ProjectUtilityStatus as reportedkVProjected in serviceTerminalsSubstations named
New Hickory 345kV Switchyard
Build a new New Hickory 345 switchyard to connect New Hickory Solar plant. This new Switchyard will loop into the existing Elm Creek to STP circuit 2 transmission line.
ERCOT project 59959 · utility no. T-0303; S-0940
CPS/NO
Tier 4
In-Service
Completed tab
345 May 2026
actual 2026-05
5323 to 5133, 5915
Jackson County
Hickory

Changes between releases

Where two consecutive releases print different values for these projects (last ten releases).

Release (data as of)ProjectWhat changedPrinted values
July 13, 202659959Status as reportedPlanned → In-Service
July 13, 202659959Moved between tabsCurrent-year planned → Completed
February 1, 202659959Moved between tabsFuture → Current-year planned
June 1, 202559959Projected in-service dateJan 2026 → May 2026
February 1, 202559959Projected in-service dateOct 2025 → Jan 2026
June 1, 202459959Projected in-service dateOct 2024 → Oct 2025

Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.