Rockhound
Named in 3 listed projects in ERCOT’s transmission project tracking workbook, in Howard County. First named in the release with data as of June 1, 2024.
Howardcounty as printed
345kV
ONCORutility
3projects listed
No HIFLD substation record has this name in this county.
Generation interconnection requests filed in Howard, TX: ERCOT queue, 17 active of 19. Same county, not the same substation.
Projects naming this substation
As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| Longshore - Rockhound 345 kV Double Circuit Line Construct new 25.5-mile Rockhound - Longshore 345 kV Double-Circuit Line ERCOT project 110587 · utility no. R8728 · RPG 26RPG015 |
ONCOR Tier 2 |
Conceptual Future tab |
345 | Jun 2029 | Rockhound to Longshore Howard / Midland County |
Rockhound, Longshore |
| Prong Moss – Rockhound 345 kV Line Rebuild ERCOT project 81296A · utility no. R3025 · RPG 23RPG029 |
ONCOR Tier 1 |
Planned Future tab |
345 | Dec 2028 | Prong Moss to Rockhound Midland / Howard County |
Prong Moss, Rockhound |
| Prong Moss – Rockhound 345 kV Line Rebuild Prong Moss – Rockhound 345 kV Second Circuit Addition ERCOT project 81296B · utility no. R3025 · RPG 23RPG029 |
ONCOR Tier 1 |
Planned Future tab |
345 | May 2029 | Prong Moss to Rockhound Midland / Howard County |
Prong Moss, Rockhound |
Changes between releases
Where two consecutive releases print different values for these projects (last ten releases).
| Release (data as of) | Project | What changed | Printed values |
|---|---|---|---|
| July 13, 2026 | 110587 | First listed | on the Future tab |
| February 1, 2026 | 81296A | First listed | on the Future tab |
| February 1, 2026 | 81296B | First listed | on the Future tab |
Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.
Before relying on any of this
- TPIT lists substation work only where it changes a transmission line or autotransformer rating. A new load-serving substation that changes no rating may never appear in it.
- Every value is the Transmission Service Provider's own statement, compiled by ERCOT. Status and in-service dates are not ERCOT determinations.
- The workbook tab (Future, Current-year planned, Completed, Cancelled) is assigned by ERCOT from dates; the status column is the TSP's word. The two can disagree, and both are shown.
- In ERCOT's competitive areas the company named is the transmission and distribution wires company, not a retail electricity provider or a generator.
- ERCOT publishes the workbook about three times a year, plus occasional updates. A substation that is not listed may simply not be reported yet.
- Substation names are read from the workbook's "from" and "to" terminal columns; for rows with neither, from fixed patterns in the title and description. No language model reads this workbook.
- An entry is a name within a county, not a verified physical facility. A link to a HIFLD record means the names and counties agree exactly, not that the two are confirmed to be one facility.
Site Scanner