Clodine
Named in 5 listed projects in ERCOT’s transmission project tracking workbook, in Harris County. First named in the release with data as of October 1, 2015.
A HIFLD substation record has the same name and county: CLODINE (HARRIS County). The names agree; that does not confirm they are the same facility.
Generation interconnection requests filed in Harris, TX: ERCOT queue, 30 active of 35 · MISO queue, 0 active of 1. Same county, not the same substation.
Projects naming this substation
As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| Upgrade Ckt.25B Clodine to Roark to increase thermal limits. ERCOT project 109607 |
CNP Tier 4 |
Planned Future tab |
138 | May 2028 | Clodine to Roark Harris County |
Clodine, Roark |
| Jeanetta Auto Upgrades Upgrade Ckt.25B Roark equipment and reconductor near Roark substation to increase thermal limits ERCOT project 78490C · RPG 23RPG031 |
CNP Tier 3 |
Planned Current-year planned tab |
138 | Oct 2026 | Clodine to Roark Harris County |
Clodine, Roark |
| Jeanetta Auto Upgrades Reconductor Ckt.25B Clodine to Roark TR8 tap to increase thermal limits. ERCOT project 78490D · RPG 23RPG031 |
CNP Tier 3 |
Planned Current-year planned tab |
138 | Oct 2026 | Clodine to Roark Harris County |
Clodine, Roark |
| Clodine Reconfiguration for Houston IV BESS (24INR0584) Install one new generator lead at the existing Clodine W670/W680 breaker position for Houston IV BESS. ERCOT project 90180A |
CNP Tier 4 |
In-Service Completed tab |
138 | Jun 2026 actual 2026-04 |
Clodine to Generator Harris County |
Clodine, Generator |
| Clodine Reconfiguration for Houston IV BESS (24INR0584) Reposition Ckt.25B Clodine to Roark to the existing W670/W710 breaker position. ERCOT project 90180B |
CNP Tier 4 |
In-Service Completed tab |
138 | Jun 2026 actual 2026-04 |
Clodine to Roark Harris County |
Clodine, Roark |
Changes between releases
Where two consecutive releases print different values for these projects (last ten releases).
| Release (data as of) | Project | What changed | Printed values |
|---|---|---|---|
| July 13, 2026 | 109607 | First listed | on the Future tab |
| July 13, 2026 | 90180A | Moved between tabs | Current-year planned → Completed |
| July 13, 2026 | 90180A | Status as reported | Planned → In-Service |
| July 13, 2026 | 90180B | Moved between tabs | Current-year planned → Completed |
| July 13, 2026 | 90180B | Status as reported | Planned → In-Service |
| June 1, 2026 | 90180A | Projected in-service date | May 2026 → Jun 2026 |
| June 1, 2026 | 90180B | Projected in-service date | May 2026 → Jun 2026 |
| February 1, 2026 | 78490C | Moved between tabs | Future → Current-year planned |
| February 1, 2026 | 78490C | Projected in-service date | May 2026 → Oct 2026 |
| February 1, 2026 | 78490D | Moved between tabs | Future → Current-year planned |
| February 1, 2026 | 78490D | Projected in-service date | May 2026 → Oct 2026 |
| February 1, 2026 | 90180A | Moved between tabs | Future → Current-year planned |
| February 1, 2026 | 90180B | Moved between tabs | Future → Current-year planned |
| February 1, 2025 | 78490C | Projected in-service date | May 2025 → May 2026 |
| February 1, 2025 | 90180A | First listed | on the Future tab |
| February 1, 2025 | 90180B | First listed | on the Future tab |
| June 1, 2024 | 78490C | First listed | on the Future tab |
| June 1, 2024 | 78490D | First listed | on the Future tab |
Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.
Before relying on any of this
- TPIT lists substation work only where it changes a transmission line or autotransformer rating. A new load-serving substation that changes no rating may never appear in it.
- Every value is the Transmission Service Provider's own statement, compiled by ERCOT. Status and in-service dates are not ERCOT determinations.
- The workbook tab (Future, Current-year planned, Completed, Cancelled) is assigned by ERCOT from dates; the status column is the TSP's word. The two can disagree, and both are shown.
- In ERCOT's competitive areas the company named is the transmission and distribution wires company, not a retail electricity provider or a generator.
- ERCOT publishes the workbook about three times a year, plus occasional updates. A substation that is not listed may simply not be reported yet.
- Substation names are read from the workbook's "from" and "to" terminal columns; for rows with neither, from fixed patterns in the title and description. No language model reads this workbook.
- An entry is a name within a county, not a verified physical facility. A link to a HIFLD record means the names and counties agree exactly, not that the two are confirmed to be one facility.