Valley 345 kV Switch
Named in 2 listed projects in ERCOT’s transmission project tracking workbook, in Fannin County. First named in the release with data as of June 1, 2024.
Also printed as: Valley Switch
No HIFLD substation record has this name in this county (a record of the same name exists in another county).
Generation interconnection requests filed in Fannin, TX: ERCOT queue, 3 active of 3. Same county, not the same substation.
Projects naming this substation
As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| Valley Switch - Progress Park Switch 138 kV Line Upgrade Valley Switch - Progress Park Switch 138 kV Line ERCOT project 109805 · utility no. M3322 · RPG 25RPG040 · RTP 2024-N07 |
ONCOR Tier 1 |
Planned Future tab |
138 | Oct 2031 | Valley Switch to Progress Park Switch Fannin / Grayson County |
Valley Switch, Progress Park Switch |
| Anna 345 kV Switch Rebuild and Anna Switch - Valley Switch 345 kV Line Upgrade Anna Switch - Valley Switch 345 kV Line and Anna 345 kV switch Rebuild ERCOT project 110284 · utility no. M3324 · RPG 25RPG040 · RTP 2024-NC31 |
ONCOR Tier 1 |
Planned Future tab |
345 | Mar 2033 | Anna 345 kV Switch to Valley 345 kV Switch Collin / Fannin County |
Anna 345 kV Switch, Valley 345 kV Switch |
Changes between releases
Where two consecutive releases print different values for these projects (last ten releases).
| Release (data as of) | Project | What changed | Printed values |
|---|---|---|---|
| July 13, 2026 | 109805 | First listed | on the Future tab |
| July 13, 2026 | 110284 | First listed | on the Future tab |
Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.
Before relying on any of this
- TPIT lists substation work only where it changes a transmission line or autotransformer rating. A new load-serving substation that changes no rating may never appear in it.
- Every value is the Transmission Service Provider's own statement, compiled by ERCOT. Status and in-service dates are not ERCOT determinations.
- The workbook tab (Future, Current-year planned, Completed, Cancelled) is assigned by ERCOT from dates; the status column is the TSP's word. The two can disagree, and both are shown.
- In ERCOT's competitive areas the company named is the transmission and distribution wires company, not a retail electricity provider or a generator.
- ERCOT publishes the workbook about three times a year, plus occasional updates. A substation that is not listed may simply not be reported yet.
- Substation names are read from the workbook's "from" and "to" terminal columns; for rows with neither, from fixed patterns in the title and description. No language model reads this workbook.
- An entry is a name within a county, not a verified physical facility. A link to a HIFLD record means the names and counties agree exactly, not that the two are confirmed to be one facility.