Shaula
Named in 1 listed project in ERCOT’s transmission project tracking workbook, in DeWitt County. First named in the release with data as of June 1, 2026.
Described as new. The quoted wording calls this substation new. “New Shaula 345kV Substation” — project 73025 title, as the utility reported it
No HIFLD substation record has this name in this county.
Generation interconnection requests filed in DeWitt, TX: ERCOT queue, 5 active of 7. Same county, not the same substation.
Location
DeWitt County, TX
County only. A source prints the county; no point is published. This is where planning documents put the substation, not a surveyed or built site, and a planned site can move.
Sources: ERCOT Transmission Project and Information Tracking (TPIT) workbook, projects 73025 (release 2026-10) · OpenStreetMap: no feature with this name (Texas-wide name search) (OSM base 2026-11-20). Map data © OpenStreetMap contributors, available under the Open Database License. Researched by Substation Scout; checked November 21, 2026.
Projects naming this substation
As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| New Shaula 345kV Substation New Shaula 345kV Substation will be looped into the existing Elm Creek to STP circuit 1 transmission line. ERCOT project 73025 · utility no. S-0970 |
CPS/NO Tier 4 |
Planned Future tab |
345 | Jan 2027 | 5380 to 5133, 5915 DeWitt County |
Shaula |
Changes between releases
Where two consecutive releases print different values for these projects (last ten releases).
| Release (data as of) | Project | What changed | Printed values |
|---|---|---|---|
| July 13, 2026 | 73025 | Moved between tabs | Current-year planned → Future |
| July 13, 2026 | 73025 | Projected in-service date | Mar 2026 → Jan 2027 |
| February 1, 2026 | 73025 | Moved between tabs | Future → Current-year planned |
| June 1, 2025 | 73025 | Projected in-service date | Nov 2026 → Mar 2026 |
| February 1, 2025 | 73025 | Projected in-service date | Nov 2024 → Nov 2026 |
Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.
Before relying on any of this
- TPIT lists substation work only where it changes a transmission line or autotransformer rating. A new load-serving substation that changes no rating may never appear in it.
- Every value is the Transmission Service Provider's own statement, compiled by ERCOT. Status and in-service dates are not ERCOT determinations.
- The workbook tab (Future, Current-year planned, Completed, Cancelled) is assigned by ERCOT from dates; the status column is the TSP's word. The two can disagree, and both are shown.
- In ERCOT's competitive areas the company named is the transmission and distribution wires company, not a retail electricity provider or a generator.
- ERCOT publishes the workbook about three times a year, plus occasional updates. A substation that is not listed may simply not be reported yet.
- Substation names are read from the workbook's "from" and "to" terminal columns; for rows with neither, from fixed patterns in the title and description. No language model reads this workbook.
- An entry is a name within a county, not a verified physical facility. A link to a HIFLD record means the names and counties agree exactly, not that the two are confirmed to be one facility.