Hickory

Named in 3 listed projects in ERCOT’s transmission project tracking workbook, in Denton County. First named in the release with data as of February 1, 2015.

Dentoncounty as printed
138kV
DMEutility
3projects listed

Described as new. The quoted wording calls this substation new. “new 138kV Hickory substation” — project 5430K description, as the utility reported it

Reported complete. Project 5430K is on the Completed tab (actual in-service 2025-07); Project 5430O is on the Completed tab (actual in-service 2025-07); Project 70019 is on the Completed tab (actual in-service 2025-06), as the utility reported it. That indicates the substation may now be built; it is not a confirmation.

A HIFLD substation record has the same name and county: HICKORY (DENTON County). The names agree; that does not confirm they are the same facility.

Generation interconnection requests filed in Denton, TX: ERCOT queue, 1 active of 1. Same county, not the same substation.

Location

33.2152, -97.1618 · Denton County, TX · view on a map

OpenStreetMap, corroborated. An OpenStreetMap feature carries this exact name, and a cited source agrees. Accurate to about ±30 m, as estimated by the research. This is where planning documents put the substation, not a surveyed or built site, and a planned site can move.

How it was located: OSM way 260225238 'Hickory Substation', operator DME (Denton Municipal Electric), voltage 138000, centroid 33.21517,-97.16184. Corroborated: HIFLD 310014 'HICKORY', Denton County, at 33.21519,-97.16178 (0.01 km away; HIFLD still lists 69 kV), and TPIT names DME as the TSP for the Hickory 138-kV conversion with lines to Bonnie Brae, RD Wells and Locust.

Note: TPIT lists the work on the Completed tab (actual 2025-07). HIFLD still carries the station at 69 kV; OSM tags 138 kV.

County: the Census county at this point.

Sources: ERCOT Transmission Project and Information Tracking (TPIT) workbook, projects 5430K, 5430O, 70019 (release 2026-10), Completed tab · HIFLD Electric Substations: HICKORY (310014), Denton County (HIFLD Electric Substations, 2022 snapshot) · OpenStreetMap: Hickory Substation (DME), way 260225238 (OSM base 2026-11-20). Map data © OpenStreetMap contributors, available under the Open Database License. Researched by Substation Scout; checked November 21, 2026.

Projects naming this substation

As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.

ProjectUtilityStatus as reportedkVProjected in serviceTerminalsSubstations named
Conversion to 138kV
Construct new 138kV Hickory substation and terminate the existing Bonnie Brae - Hickory (which is already insulated for 138kV) at the new 138kV Hickory substation.
ERCOT project 5430K · RTP N/A
DME
Tier 4
Planned
Completed tab
138 Jul 2025
actual 2025-07
Bonnie Brae to Hickory
Denton County
Bonnie Brae, Hickory
Conversion to 138kV
Reconnect the 69kV Hickory - RD Wells to the 138kV Hickory and RD Wells substations. Line is already insulated for 138kV.
ERCOT project 5430O · RTP N/A
DME
Tier 4
Planned
Completed tab
138 Jul 2025
actual 2025-07
Hickory to RD Wells
Denton County
Hickory, RD Wells
Add 138kV Locust-Hickory line 700MVA
ERCOT project 70019 · RPG N/A · RTP N/A
DME
Tier 4
Planned
Completed tab
138 Jun 2025
actual 2025-06
Locust to Hickory
Denton County
Locust, Hickory

Changes between releases

Where two consecutive releases print different values for these projects (last ten releases).

Release (data as of)ProjectWhat changedPrinted values
October 1, 20255430KMoved between tabsCurrent-year planned → Completed
October 1, 20255430OMoved between tabsCurrent-year planned → Completed
October 1, 202570019Moved between tabsCurrent-year planned → Completed
June 1, 20255430KMoved between tabsFuture → Current-year planned
June 1, 20255430OMoved between tabsFuture → Current-year planned
June 1, 202570019Moved between tabsFuture → Current-year planned

Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.