Hickory
Named in 3 listed projects in ERCOT’s transmission project tracking workbook, in Denton County. First named in the release with data as of February 1, 2015.
Described as new. The quoted wording calls this substation new. “new 138kV Hickory substation” — project 5430K description, as the utility reported it
Reported complete. Project 5430K is on the Completed tab (actual in-service 2025-07); Project 5430O is on the Completed tab (actual in-service 2025-07); Project 70019 is on the Completed tab (actual in-service 2025-06), as the utility reported it. That indicates the substation may now be built; it is not a confirmation.
A HIFLD substation record has the same name and county: HICKORY (DENTON County). The names agree; that does not confirm they are the same facility.
Generation interconnection requests filed in Denton, TX: ERCOT queue, 1 active of 1. Same county, not the same substation.
Location
33.2152, -97.1618 · Denton County, TX · view on a map
OpenStreetMap, corroborated. An OpenStreetMap feature carries this exact name, and a cited source agrees. Accurate to about ±30 m, as estimated by the research. This is where planning documents put the substation, not a surveyed or built site, and a planned site can move.
How it was located: OSM way 260225238 'Hickory Substation', operator DME (Denton Municipal Electric), voltage 138000, centroid 33.21517,-97.16184. Corroborated: HIFLD 310014 'HICKORY', Denton County, at 33.21519,-97.16178 (0.01 km away; HIFLD still lists 69 kV), and TPIT names DME as the TSP for the Hickory 138-kV conversion with lines to Bonnie Brae, RD Wells and Locust.
Note: TPIT lists the work on the Completed tab (actual 2025-07). HIFLD still carries the station at 69 kV; OSM tags 138 kV.
County: the Census county at this point.
Sources: ERCOT Transmission Project and Information Tracking (TPIT) workbook, projects 5430K, 5430O, 70019 (release 2026-10), Completed tab · HIFLD Electric Substations: HICKORY (310014), Denton County (HIFLD Electric Substations, 2022 snapshot) · OpenStreetMap: Hickory Substation (DME), way 260225238 (OSM base 2026-11-20). Map data © OpenStreetMap contributors, available under the Open Database License. Researched by Substation Scout; checked November 21, 2026.
Projects naming this substation
As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| Conversion to 138kV Construct new 138kV Hickory substation and terminate the existing Bonnie Brae - Hickory (which is already insulated for 138kV) at the new 138kV Hickory substation. ERCOT project 5430K · RTP N/A |
DME Tier 4 |
Planned Completed tab |
138 | Jul 2025 actual 2025-07 |
Bonnie Brae to Hickory Denton County |
Bonnie Brae, Hickory |
| Conversion to 138kV Reconnect the 69kV Hickory - RD Wells to the 138kV Hickory and RD Wells substations. Line is already insulated for 138kV. ERCOT project 5430O · RTP N/A |
DME Tier 4 |
Planned Completed tab |
138 | Jul 2025 actual 2025-07 |
Hickory to RD Wells Denton County |
Hickory, RD Wells |
| Add 138kV Locust-Hickory line 700MVA ERCOT project 70019 · RPG N/A · RTP N/A |
DME Tier 4 |
Planned Completed tab |
138 | Jun 2025 actual 2025-06 |
Locust to Hickory Denton County |
Locust, Hickory |
Changes between releases
Where two consecutive releases print different values for these projects (last ten releases).
| Release (data as of) | Project | What changed | Printed values |
|---|---|---|---|
| October 1, 2025 | 5430K | Moved between tabs | Current-year planned → Completed |
| October 1, 2025 | 5430O | Moved between tabs | Current-year planned → Completed |
| October 1, 2025 | 70019 | Moved between tabs | Current-year planned → Completed |
| June 1, 2025 | 5430K | Moved between tabs | Future → Current-year planned |
| June 1, 2025 | 5430O | Moved between tabs | Future → Current-year planned |
| June 1, 2025 | 70019 | Moved between tabs | Future → Current-year planned |
Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.
Before relying on any of this
- TPIT lists substation work only where it changes a transmission line or autotransformer rating. A new load-serving substation that changes no rating may never appear in it.
- Every value is the Transmission Service Provider's own statement, compiled by ERCOT. Status and in-service dates are not ERCOT determinations.
- The workbook tab (Future, Current-year planned, Completed, Cancelled) is assigned by ERCOT from dates; the status column is the TSP's word. The two can disagree, and both are shown.
- In ERCOT's competitive areas the company named is the transmission and distribution wires company, not a retail electricity provider or a generator.
- ERCOT publishes the workbook about three times a year, plus occasional updates. A substation that is not listed may simply not be reported yet.
- Substation names are read from the workbook's "from" and "to" terminal columns; for rows with neither, from fixed patterns in the title and description. No language model reads this workbook.
- An entry is a name within a county, not a verified physical facility. A link to a HIFLD record means the names and counties agree exactly, not that the two are confirmed to be one facility.