Loop Nine Switch

Named in 2 listed projects in ERCOT’s transmission project tracking workbook, in Dallas County. First named in the release with data as of July 13, 2026.

Dallascounty as printed
138, 345kV
ONCORutility
2projects listed

No HIFLD substation record has this name in this county.

Generation interconnection requests filed in Dallas, TX: ERCOT queue, 9 active of 11. Same county, not the same substation.

Projects naming this substation

As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.

ProjectUtilityStatus as reportedkVProjected in serviceTerminalsSubstations named
Desoto Switch - Loop Nine Switch 138 kV Line
Establish Desoto Switch - Loop Nine Switch 138 kV Line
ERCOT project 110342 · utility no. M4011 · RPG 25RPG042 · RTP 2024-NC80
ONCOR
Tier 1
Planned
Future tab
138 Dec 2029 Desoto Switch to Loop Nine Switch
Dallas County
Desoto Switch, Loop Nine Switch
Loop Nine Switch - Watermill Switch 345 kV Line
Upgrade Loop Nine Switch - Watermill Switch 345 kV Line
ERCOT project 110389 · utility no. M4443 · RPG 25RPG042 · RTP 2024-NC16
ONCOR
Tier 1
Planned
Future tab
345 Jun 2029 Loop Nine Switch to Watermill Switch
Dallas County
Loop Nine Switch, Watermill Switch

Changes between releases

Where two consecutive releases print different values for these projects (last ten releases).

Release (data as of)ProjectWhat changedPrinted values
July 13, 2026110342First listedon the Future tab
July 13, 2026110389First listedon the Future tab

Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.