Ollin
Named in 2 listed projects in ERCOT’s transmission project tracking workbook, in Crane County. First named in the release with data as of February 1, 2019.
Described as new. The quoted wording calls this substation new. “new Ollin 138 kV station” — project 45155 description, as the utility reported it
Reported complete. Project 45155 is on the Completed tab (actual in-service 2025-06); Project 45174 is on the Completed tab (actual in-service 2025-12), as the utility reported it. That indicates the substation may now be built; it is not a confirmation.
No HIFLD substation record has this name in this county.
Generation interconnection requests filed in Crane, TX: ERCOT queue, 13 active of 14. Same county, not the same substation.
Location
Crane County, TX
County only. A source prints the county; no point is published. This is where planning documents put the substation, not a surveyed or built site, and a planned site can move.
Note: TPIT lists 45155 and 45174 on the Completed tab: In-Service, actual dates 2025-06 and 2025-12. The progress report lists the station as 'Ollin 69-kV', built to 138-kV standards.
Sources: ERCOT Transmission Project and Information Tracking (TPIT) workbook, projects 45155, 45174 (release 2026-10) · AEP Texas construction progress report (North Division), PUCT Project 57477 item 149 (2025-05-15), North Division, Ollin entries · OpenStreetMap: Crane-area substations (OSM base 2026-11-20). Map data © OpenStreetMap contributors, available under the Open Database License. Researched by Substation Scout; checked November 21, 2026.
Projects naming this substation
As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| Ollin: Build 138 kV station Construct new Ollin 138 kV station ERCOT project 45155 · utility no. 2752 · RPG 19RPG013 |
AEP TNC Tier 4 |
In-Service Completed tab |
138 | Jun 2025 actual 2025-06 |
Ollin Crane County |
Ollin |
| Ollin to LCRA Crane: Partial Build, Partial Rebuild, and Conversion Build new Ollin 138 kV station; partial build, rebuild, and conversion to 138 kV of Ollin to LCRA Crane; and rebuild McElroy to Sage ERCOT project 45174 · utility no. 2767 · RPG 19RPG013 |
AEP TNC Tier 4 |
In-Service Completed tab |
138 | Jan 2026 actual 2025-12 |
Ollin to LCRA Crane Crane County |
Ollin, Crane |
Changes between releases
Where two consecutive releases print different values for these projects (last ten releases).
| Release (data as of) | Project | What changed | Printed values |
|---|---|---|---|
| July 13, 2026 | 45174 | Moved between tabs | Current-year planned → Completed |
| July 13, 2026 | 45174 | Status as reported | Planned → In-Service |
| February 1, 2026 | 45174 | Projected in-service date | Sep 2025 → Jan 2026 |
| October 1, 2025 | 45155 | Moved between tabs | Current-year planned → Completed |
| October 1, 2025 | 45155 | Status as reported | Under Construction → In-Service |
| October 1, 2025 | 45174 | Projected in-service date | Apr 2025 → Sep 2025 |
| June 1, 2025 | 45155 | Moved between tabs | Future → Current-year planned |
| June 1, 2025 | 45174 | Moved between tabs | Future → Current-year planned |
| February 1, 2025 | 45155 | Status as reported | Planned → Under Construction |
| February 1, 2025 | 45155 | Projected in-service date | Dec 2024 → Jun 2025 |
| June 1, 2024 | 45174 | Projected in-service date | Jan 2025 → Apr 2025 |
Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.
Before relying on any of this
- TPIT lists substation work only where it changes a transmission line or autotransformer rating. A new load-serving substation that changes no rating may never appear in it.
- Every value is the Transmission Service Provider's own statement, compiled by ERCOT. Status and in-service dates are not ERCOT determinations.
- The workbook tab (Future, Current-year planned, Completed, Cancelled) is assigned by ERCOT from dates; the status column is the TSP's word. The two can disagree, and both are shown.
- In ERCOT's competitive areas the company named is the transmission and distribution wires company, not a retail electricity provider or a generator.
- ERCOT publishes the workbook about three times a year, plus occasional updates. A substation that is not listed may simply not be reported yet.
- Substation names are read from the workbook's "from" and "to" terminal columns; for rows with neither, from fixed patterns in the title and description. No language model reads this workbook.
- An entry is a name within a county, not a verified physical facility. A link to a HIFLD record means the names and counties agree exactly, not that the two are confirmed to be one facility.