Hamilton Wolf
Named in 1 listed project in ERCOT’s transmission project tracking workbook. First named in the release with data as of July 13, 2026.
—county as printed
138kV
STECutility
1projects listed
No HIFLD substation record has this name in this county.
Projects naming this substation
As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| STEC Rodgers Large Load Project Phase 2 -Rebuild LCRA Henne to Zorn 138kV line to 245 MVA -Install cap bank 19.2 MVAR at STEC Natalia 69kV - Rebuild Palo Duro to Dilley 138kV line with a conductor rated at least 312 MVA - Install a new 134MVAR cap bank at AEP Lytle 138kV - Rebuild CPS / AEP Lytle - Lytle with conductors rated 354 MVA -Rebuild AEP Big Foot to Pleasanton 138kV with conductors 147 MVA - install new cap bank 55.01 MVAR at P… ERCOT project 110525 · RPG 25RPG046 |
STEC Tier 1 |
Conceptual Future tab |
138 | Dec 2030 | No terminals printed | Henne, Zorn, Palo Duro, Dilley, Big Foot, Pleasanton, Bader, Pearson, Omicron, Rafter, Bander, Hamilton Wolf, Hondo Creek, Devine |
Changes between releases
Where two consecutive releases print different values for these projects (last ten releases).
| Release (data as of) | Project | What changed | Printed values |
|---|---|---|---|
| July 13, 2026 | 110525 | First listed | on the Future tab |
Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.
Before relying on any of this
- TPIT lists substation work only where it changes a transmission line or autotransformer rating. A new load-serving substation that changes no rating may never appear in it.
- Every value is the Transmission Service Provider's own statement, compiled by ERCOT. Status and in-service dates are not ERCOT determinations.
- The workbook tab (Future, Current-year planned, Completed, Cancelled) is assigned by ERCOT from dates; the status column is the TSP's word. The two can disagree, and both are shown.
- In ERCOT's competitive areas the company named is the transmission and distribution wires company, not a retail electricity provider or a generator.
- ERCOT publishes the workbook about three times a year, plus occasional updates. A substation that is not listed may simply not be reported yet.
- Substation names are read from the workbook's "from" and "to" terminal columns; for rows with neither, from fixed patterns in the title and description. No language model reads this workbook.
- An entry is a name within a county, not a verified physical facility. A link to a HIFLD record means the names and counties agree exactly, not that the two are confirmed to be one facility.