Substation Scout

River Oaks

Named in 1 listed project in ERCOT’s transmission project tracking workbook, in Comal County. First named in the release with data as of June 1, 2021.

Comalcounty as printed
138kV
LCRATSCutility
1projects listed

A HIFLD substation record has the same name and county: RIVER OAKS (COMAL County). The names agree; that does not confirm they are the same facility.

Generation interconnection requests filed in Comal, TX: ERCOT queue, 2 active of 4. Same county, not the same substation.

Projects naming this substation

As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.

ProjectUtilityStatus as reportedkVProjected in serviceTerminalsSubstations named
River Oaks Bus Substation Upgrade
LCRA will upgrade terminal equipment at River Oaks Substation to increase the operational rating of the terminating 138 kV lines as an LCP project for Batch Zero Base Load
ERCOT project 110132
LCRATSC
Tier 4
Conceptual
Future tab
138 May 2029 River Oaks
Comal County
River Oaks

Changes between releases

Where two consecutive releases print different values for these projects (last ten releases).

Release (data as of)ProjectWhat changedPrinted values
July 13, 2026110132First listedon the Future tab

Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.

Before relying on any of this