Highway46

Named in 1 listed project in ERCOT’s transmission project tracking workbook, in Comal County. First named in the release with data as of July 13, 2026.

Comalcounty as printed
138kV
LCRATSCutility
1projects listed

No HIFLD substation record has this name in this county.

Generation interconnection requests filed in Comal, TX: ERCOT queue, 2 active of 4. Same county, not the same substation.

Projects naming this substation

As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.

ProjectUtilityStatus as reportedkVProjected in serviceTerminalsSubstations named
Highway 46 Bus Substation Upgrade
Upgrade terminal equipment at Highway46 (Bus #7177) to increase operational rating of terminating 138.0-kV lines as an LCP Upgrade project for Batch Zero Base Load.
ERCOT project 109916
LCRATSC
Tier 4
Conceptual
Future tab
138 Dec 2029 Highway46
Comal County
Highway46

Changes between releases

Where two consecutive releases print different values for these projects (last ten releases).

Release (data as of)ProjectWhat changedPrinted values
July 13, 2026109916Projected in-service dateDec 2030 → Dec 2029
July 13, 2026109916First listedon the Future tab

Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.