Euclid
Named in 3 listed projects in ERCOT’s transmission project tracking workbook, in Caldwell County. First named in the release with data as of October 1, 2024.
Expansion at an existing substation: new voltage level. The quoted wording describes a yard, bus or conversion at a voltage this substation is not otherwise shown at. “construct a new Euclid 765-kV yard” — project 104118, as the utility reported it
No HIFLD substation record has this name in this county.
Generation interconnection requests filed in Caldwell, TX: ERCOT queue, 16 active of 17. Same county, not the same substation.
Projects naming this substation
As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| LCRATSC Euclid 765-kV Substation Addition This project will construct a new Euclid 765-kV yard adjacent to the existing Euclid 345-kV Substation (PLC-7694) and install two new 765/345-kV autotransformers. ERCOT project 104118 · RPG 26RPG001 |
LCRATSC Tier 1 |
Planned Future tab |
765 | Jun 2031 | No terminals printed Caldwell County |
Euclid |
| LCRATSC Euclid to Hillje (Morely) 765kV Transmission Line Addition Construct a new 765-kV single-circuit transmission line from Euclid Substation to a point-of-interconnection (POI) with CenterPoint Energy (CNPE). ERCOT project 104732 · RPG 26RPG001 |
LCRATSC Tier 1 |
Planned Future tab |
765 | Jun 2031 | Euclid to Morely Caldwell / Wharton County |
Euclid, Morely |
| Euclid_Substation_Addition_Updated LCRA TSC provide a new transmission point of interconnection by constructing a new 345-kV substation and cut-in T510 Hutto - Zorn. T510 will also be looped into the new Limmer 345-kV substation ERCOT project 85947 |
LCRATSC Tier 4 |
Planned Current-year planned tab |
345 | Nov 2026 actual 2026-11 |
No terminals printed Caldwell County |
Euclid, Limmer |
Changes between releases
Where two consecutive releases print different values for these projects (last ten releases).
| Release (data as of) | Project | What changed | Printed values |
|---|---|---|---|
| June 1, 2026 | 104118 | First listed | on the Future tab |
| June 1, 2026 | 104732 | First listed | on the Future tab |
| February 1, 2026 | 85947 | Moved between tabs | Future → Current-year planned |
| October 1, 2024 | 85947 | First listed | on the Future tab |
Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.
Before relying on any of this
- TPIT lists substation work only where it changes a transmission line or autotransformer rating. A new load-serving substation that changes no rating may never appear in it.
- Every value is the Transmission Service Provider's own statement, compiled by ERCOT. Status and in-service dates are not ERCOT determinations.
- The workbook tab (Future, Current-year planned, Completed, Cancelled) is assigned by ERCOT from dates; the status column is the TSP's word. The two can disagree, and both are shown.
- In ERCOT's competitive areas the company named is the transmission and distribution wires company, not a retail electricity provider or a generator.
- ERCOT publishes the workbook about three times a year, plus occasional updates. A substation that is not listed may simply not be reported yet.
- Substation names are read from the workbook's "from" and "to" terminal columns; for rows with neither, from fixed patterns in the title and description. No language model reads this workbook.
- An entry is a name within a county, not a verified physical facility. A link to a HIFLD record means the names and counties agree exactly, not that the two are confirmed to be one facility.