Lyle Wolz
Named in 4 listed projects in ERCOT’s transmission project tracking workbook, in Burleson County. First named in the release with data as of February 1, 2017.
Burlesoncounty as printed
138kV
BBEC, LCRATSCutility
4projects listed
No HIFLD substation record has this name in this county.
Generation interconnection requests filed in Burleson, TX: ERCOT queue, 1 active of 1. Same county, not the same substation.
Projects naming this substation
As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| BBEC Lyle Wolz to Lyons Transmission Line Upgrade Replace 336 (Linnet) conductor with 959 (Suwannee) and replace a limited number of structures to accommodate the new conductor. ERCOT project 104601 |
BBEC Tier 4 |
Planned Future tab |
138 | Dec 2027 | Lyle Wolz to Lyons Burleson County |
Lyle Wolz, Lyons |
| BBEC Lexington to Lyle Wolz Transmission Line Upgrade Replace 336 (Linnet) conductor with 959 (Suwannee) and replace a limited number of structures to accommodate the new conductor. ERCOT project 104605 |
BBEC Tier 4 |
Planned Future tab |
138 | Dec 2027 | Lexington to Lyle Wolz Lee / Burleson County |
Lexington, Lyle Wolz |
| Upgrade LYLEWOLZ Cap Bank from 15.6 MVAR to 31.2 MVAR LCRA will improve reliability at various substations by replacing capacitor banks ERCOT project 109788 · utility no. PLC-8446 |
LCRATSC Tier 4 |
Planned Future tab |
138 | May 2028 | Lyle Wolz Burleson County |
Lyle Wolz |
| Lyle Wolz Substation Upgrade LCRA will upgrade terminal equipment at LYLEWO (7567) to achieve a minimum 345 MVA rating. Upgrade project for Batch Zero Base Load ERCOT project 110136 |
LCRATSC Tier 4 |
Planned Future tab |
138 | Dec 2029 | Lyle Wolz Burleson County |
Lyle Wolz |
Changes between releases
Where two consecutive releases print different values for these projects (last ten releases).
| Release (data as of) | Project | What changed | Printed values |
|---|---|---|---|
| July 13, 2026 | 110136 | Projected in-service date | May 2030 → Dec 2029 |
| July 13, 2026 | 109788 | First listed | on the Future tab |
| July 13, 2026 | 110136 | First listed | on the Future tab |
| June 1, 2026 | 104601 | First listed | on the Future tab |
| June 1, 2026 | 104605 | First listed | on the Future tab |
Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.
Before relying on any of this
- TPIT lists substation work only where it changes a transmission line or autotransformer rating. A new load-serving substation that changes no rating may never appear in it.
- Every value is the Transmission Service Provider's own statement, compiled by ERCOT. Status and in-service dates are not ERCOT determinations.
- The workbook tab (Future, Current-year planned, Completed, Cancelled) is assigned by ERCOT from dates; the status column is the TSP's word. The two can disagree, and both are shown.
- In ERCOT's competitive areas the company named is the transmission and distribution wires company, not a retail electricity provider or a generator.
- ERCOT publishes the workbook about three times a year, plus occasional updates. A substation that is not listed may simply not be reported yet.
- Substation names are read from the workbook's "from" and "to" terminal columns; for rows with neither, from fixed patterns in the title and description. No language model reads this workbook.
- An entry is a name within a county, not a verified physical facility. A link to a HIFLD record means the names and counties agree exactly, not that the two are confirmed to be one facility.