Burleson, TX interconnection queue

1 active project totalling 150.4 MW in the ERCOT queue.

1active projects
150.4active MW
1total filed
Queue IDProjectkVMWResourceStatus
30INR0111 Tradition BESS 138 150.4 Battery SS Started, FIS Started, No IA

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with ERCOT before relying on these figures.