Substation Scout

Burleson, TX interconnection queue

1 active project totalling 150.4 MW in the ERCOT queue.

1active projects
150.4active MW
1total filed
Queue IDProjectkVMWResourceStatus
30INR0111 Tradition BESS 138 150.4 Battery SS Completed, FIS Started, No IA

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.