Burleson, TX interconnection queue
1 active project totalling 150.4 MW in the ERCOT queue.
1active projects
150.4active MW
1total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| 30INR0111 | Tradition BESS | 138 | 150.4 | Battery | SS Started, FIS Started, No IA |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with ERCOT before relying on these figures.