Elmaton
Named in 2 listed projects in ERCOT’s transmission project tracking workbook, in Brazoria County. First named in the release with data as of October 1, 2023.
Described as new. The quoted wording calls this substation new. “new Elmaton substation” — project 75780A title, as the utility reported it
No HIFLD substation record has this name in this county.
Generation interconnection requests filed in Brazoria, TX: ERCOT queue, 54 active of 63. Same county, not the same substation.
Location
Brazoria County, TX
On a named line, no point. No point is published. The planning documents place it on the transmission line named in the quote above, and both ends of that line are located. This is where planning documents put the substation, not a surveyed or built site, and a planned site can move.
Note: County uncertain: TPIT lists Brazoria, but an aggregator page lists Duffy BESS (the generator the station serves) in Matagorda County with POI 'Tap 345kV WAP to STP CKT39', and Elmaton is also the name of a community in Matagorda County. The STP - W. A. Parish line crosses Matagorda, Wharton, Brazoria and Fort Bend counties, so the line does not settle it.
Sources: ERCOT TPIT, projects 75780A, 75780B (release 39, 2026-10-01) · OpenStreetMap: South Texas Project Switchyard, W. A. Parish Station (OSM base 2026-11-20) · interconnection.fyi aggregator page, Duffy BESS (ERCOT 26INR0250) (n/a). Map data © OpenStreetMap contributors, available under the Open Database License. Researched by Substation Scout; checked November 21, 2026.
Projects naming this substation
As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| Loop new Elmaton substation into Ckt.39A to create new Ckt.39 STP to Elmaton to WA Parish. Install generator lead from Elmaton (ELM) substation to DUFFY (DUF) / Duffy BESS (26INR0250) Loop new Elmaton substation into Ckt.39A to create new Ckt.39 STP to Elmaton to WA Parish. ERCOT project 75780A |
CNP Tier 4 |
Planned Current-year planned tab |
345 | Dec 2026 | Elmaton to STP /WA Parish Brazoria County |
Elmaton, STP, WA Parish |
| Loop new Elmaton substation into Ckt.39A to create new Ckt.39 STP to Elmaton to WA Parish. Install generator lead from Elmaton (ELM) substation to DUFFY (DUF) / Duffy BESS (26INR0250) Install generator lead from Elmaton (ELM) substation to DUFFY (DUF) / Duffy BESS (26INR0250) ERCOT project 75780B |
CNP Tier 4 |
Planned Current-year planned tab |
345 | Dec 2026 | Elmaton to DUFFY Brazoria County |
Elmaton, DUFFY |
Changes between releases
Where two consecutive releases print different values for these projects (last ten releases).
| Release (data as of) | Project | What changed | Printed values |
|---|---|---|---|
| July 13, 2026 | 75780A | Projected in-service date | Nov 2026 → Dec 2026 |
| July 13, 2026 | 75780B | Projected in-service date | Nov 2026 → Dec 2026 |
| June 1, 2026 | 75780A | Projected in-service date | Oct 2026 → Nov 2026 |
| June 1, 2026 | 75780B | Projected in-service date | Oct 2026 → Nov 2026 |
| February 1, 2026 | 75780A | Moved between tabs | Future → Current-year planned |
| February 1, 2026 | 75780A | Projected in-service date | May 2026 → Oct 2026 |
| February 1, 2026 | 75780B | Moved between tabs | Future → Current-year planned |
| February 1, 2026 | 75780B | Projected in-service date | May 2026 → Oct 2026 |
| October 1, 2025 | 75780A | Projected in-service date | May 2027 → May 2026 |
| October 1, 2025 | 75780B | Projected in-service date | Dec 2027 → May 2026 |
| June 1, 2025 | 75780B | Projected in-service date | May 2027 → Dec 2027 |
| February 1, 2025 | 75780A | Projected in-service date | Mar 2026 → May 2027 |
| February 1, 2025 | 75780B | Projected in-service date | Mar 2026 → May 2027 |
Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.
Before relying on any of this
- TPIT lists substation work only where it changes a transmission line or autotransformer rating. A new load-serving substation that changes no rating may never appear in it.
- Every value is the Transmission Service Provider's own statement, compiled by ERCOT. Status and in-service dates are not ERCOT determinations.
- The workbook tab (Future, Current-year planned, Completed, Cancelled) is assigned by ERCOT from dates; the status column is the TSP's word. The two can disagree, and both are shown.
- In ERCOT's competitive areas the company named is the transmission and distribution wires company, not a retail electricity provider or a generator.
- ERCOT publishes the workbook about three times a year, plus occasional updates. A substation that is not listed may simply not be reported yet.
- Substation names are read from the workbook's "from" and "to" terminal columns; for rows with neither, from fixed patterns in the title and description. No language model reads this workbook.
- An entry is a name within a county, not a verified physical facility. A link to a HIFLD record means the names and counties agree exactly, not that the two are confirmed to be one facility.