Booster
Named in 0 listed projects in ERCOT’s transmission project tracking workbook, in Brazoria County, plus 1 on its Cancelled tab. First named in the release with data as of February 1, 2024.
Projects cancelled. Every project naming Booster is on the Cancelled tab of ERCOT's workbook.
A HIFLD substation record has the same name and county: BOOSTER (BRAZORIA County). The names agree; that does not confirm they are the same facility.
Generation interconnection requests filed in Brazoria, TX: ERCOT queue, 54 active of 63. Same county, not the same substation.
Projects naming this substation
As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.
On the Cancelled tab
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| Odin (ODI) 138kV CEHE Substation (In terms of completed Waterfowl substation) Loop new CEHE 138kV substation Odin (ODI) into Ckt.36 to create new Ckt.36 COPPER to Odin to Booster tap to Jones Creek. ERCOT project 78473A |
CNP Tier 3 |
Conceptual Cancelled tab |
138 | Apr 2027 | Odin to Brazosport/ Booster Brazoria County |
Odin, Brazosport, Booster |
Changes between releases
Where two consecutive releases print different values for these projects (last ten releases).
| Release (data as of) | Project | What changed | Printed values |
|---|---|---|---|
| February 1, 2025 | 78473A | Moved between tabs | Future → Cancelled |
| February 1, 2025 | 78473A | Status as reported | Planned → Conceptual |
| February 1, 2025 | 78473A | Projected in-service date | Jan 2026 → Apr 2027 |
Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.
Before relying on any of this
- TPIT lists substation work only where it changes a transmission line or autotransformer rating. A new load-serving substation that changes no rating may never appear in it.
- Every value is the Transmission Service Provider's own statement, compiled by ERCOT. Status and in-service dates are not ERCOT determinations.
- The workbook tab (Future, Current-year planned, Completed, Cancelled) is assigned by ERCOT from dates; the status column is the TSP's word. The two can disagree, and both are shown.
- In ERCOT's competitive areas the company named is the transmission and distribution wires company, not a retail electricity provider or a generator.
- ERCOT publishes the workbook about three times a year, plus occasional updates. A substation that is not listed may simply not be reported yet.
- Substation names are read from the workbook's "from" and "to" terminal columns; for rows with neither, from fixed patterns in the title and description. No language model reads this workbook.
- An entry is a name within a county, not a verified physical facility. A link to a HIFLD record means the names and counties agree exactly, not that the two are confirmed to be one facility.