Named in 1 listed project in ERCOT’s transmission project tracking workbook, in Blanco County. First named in the release with data as of February 1, 2015.

Blancocounty as printed
138kV
PECutility
1projects listed

A HIFLD substation record has the same name and county: MOUNTAIN TOP (BLANCO County). The names agree; that does not confirm they are the same facility.

Generation interconnection requests filed in Blanco, TX: ERCOT queue, 1 active of 1. Same county, not the same substation.

Projects naming this substation

As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.

ProjectUtilityStatus as reportedkVProjected in serviceTerminalsSubstations named
PEC_MountainTop_Blanco_DevilsHill_VoltageUpgrade
Rebuild and upgrade Mountain Top to Blanco 69 kV circuit to 138 kV with bundled 795 kcmil conductor (440 MVA). (Replaces ERCOT Project # 70367A)
ERCOT project 72579A · RPG 22RPG033
PEC
Tier 4
Planned
Current-year planned tab
138 Dec 2025 Mountain Top to Blanco
Blanco County
Mountain Top, Blanco

Changes between releases

Where two consecutive releases print different values for these projects (last ten releases).

Release (data as of)ProjectWhat changedPrinted values
June 1, 202572579AMoved between tabsFuture → Current-year planned
October 1, 202472579AProjected in-service dateNov 2025 → Dec 2025

Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.