Blanco, TX interconnection queue

1 active project totalling 153.6 MW in the ERCOT queue.

1active projects
153.6active MW
1total filed
Queue IDProjectkVMWResourceStatus
26INR0616 Blanco County Behrends Storage 138 153.6 Battery SS Completed, FIS Started, No IA

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.