Wiseman
Named in 1 listed project in ERCOT’s transmission project tracking workbook, in Bexar County. First named in the release with data as of June 1, 2026.
Described as new. The quoted wording calls this substation new. “New Wiseman 138kV Substation” — project 73366 title, as the utility reported it
No HIFLD substation record has this name in this county.
Generation interconnection requests filed in Bexar, TX: ERCOT queue, 22 active of 23. Same county, not the same substation.
Location
29.4710, -98.7027 · Bexar County, TX · view on a map
Read off a planning map. Read off a planning map by matching it to roads and other mapped features. Accurate to about ±150 m, as estimated by the research. This is where planning documents put the substation, not a surveyed or built site, and a planned site can move.
How it was located: Symbol anchored: the grey triangle 'Proposed Project Substation' (legend symbol) at the north end of Route H on CPS Energy's SAT15 138 kV Transmission Line Project 'Approved Route' map (POWER Engineers, dated 11/5/2024). Read at 220 dpi with a three-point affine fit on OSM intersections: Wiseman Blvd x Loop 1604 (29.4654,-98.7114), Wiseman Blvd x N Ellison Dr (29.4674,-98.7048), N Ellison Dr x Westover Link (29.4659,-98.7006); ~2.2-2.5 m/px. The triangle sits on the map's Wiseman Blvd line, and the fitted point is ~30 m from OSM Wiseman Blvd (29.47001,-98.70278 at the nearest vertex). +/- ~150 m.
Note: CPS's project name is 'SAT15'; the PUCT order and TPIT call the station Wiseman. Identity rests on the order's wording (Cagnon-to-Helotes line to 'the new proposed Wiseman substation'), which matches TPIT 73366.
County: the Census county at this point.
Sources: CPS Energy SAT15 138 kV Transmission Line Project, Approved Route (Route H) map (2024-11-05), p. 1 · PUCT Docket 55728, Order approving Route H for CPS Energy's SAT15 138-kV line to the Wiseman substation (2024-11), Order pp.1-3, finding 13 and 93 · CPS Energy, SAT15 Substation and Transmission Line Project brochure (2023-05-05), p.2 · OpenStreetMap: Wiseman Blvd, N Ellison Dr, Westover Link, Loop 1604 (OSM base 2026-11-20) · ERCOT TPIT, project 73366 (release 39, 2026-10-01). Map data © OpenStreetMap contributors, available under the Open Database License. Researched by Substation Scout; checked November 21, 2026.
Projects naming this substation
As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| New Wiseman 138kV Substation Loop new 138 kV substation into existing 138kV Cagnon to Helotes Transmission Line. ERCOT project 73366 · utility no. S-0934 |
CPS/NO Tier 4 |
Planned Future tab |
138 | May 2028 | 5487 to 5055, 5200 Bexar County |
Wiseman |
Changes between releases
Where two consecutive releases print different values for these projects (last ten releases).
| Release (data as of) | Project | What changed | Printed values |
|---|---|---|---|
| July 13, 2026 | 73366 | Projected in-service date | Oct 2027 → May 2028 |
| June 1, 2025 | 73366 | Projected in-service date | May 2027 → Oct 2027 |
| October 1, 2024 | 73366 | Projected in-service date | May 2026 → May 2027 |
Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.
Before relying on any of this
- TPIT lists substation work only where it changes a transmission line or autotransformer rating. A new load-serving substation that changes no rating may never appear in it.
- Every value is the Transmission Service Provider's own statement, compiled by ERCOT. Status and in-service dates are not ERCOT determinations.
- The workbook tab (Future, Current-year planned, Completed, Cancelled) is assigned by ERCOT from dates; the status column is the TSP's word. The two can disagree, and both are shown.
- In ERCOT's competitive areas the company named is the transmission and distribution wires company, not a retail electricity provider or a generator.
- ERCOT publishes the workbook about three times a year, plus occasional updates. A substation that is not listed may simply not be reported yet.
- Substation names are read from the workbook's "from" and "to" terminal columns; for rows with neither, from fixed patterns in the title and description. No language model reads this workbook.
- An entry is a name within a county, not a verified physical facility. A link to a HIFLD record means the names and counties agree exactly, not that the two are confirmed to be one facility.