Verde Circle
Named in 1 listed project in ERCOT’s transmission project tracking workbook, in Bexar County. First named in the release with data as of October 1, 2022.
Described as new. The quoted wording calls this substation new. “New 138 kV Verde Circle Substation” — project 70536 title, as the utility reported it
Reported complete. Project 70536 is on the Completed tab (actual in-service 2025-11), as the utility reported it. That indicates the substation may now be built; it is not a confirmation.
No HIFLD substation record has this name in this county.
Generation interconnection requests filed in Bexar, TX: ERCOT queue, 22 active of 23. Same county, not the same substation.
Location
29.4740, -98.6820 · Bexar County, TX · view on a map
OpenStreetMap, corroborated. An OpenStreetMap feature carries this exact name, and a cited source agrees. This is where planning documents put the substation, not a surveyed or built site, and a planned site can move.
How it was located: OSM way 1344369108 'Verde Circle Substation' (operator CPS Energy, voltage 138000, substation=industrial), centroid. Corroborated by TPIT 70536, which loops the station into the existing Westover Hills - VLSI 138 kV line: OSM VLSI Substation (way 112556046) is 0.33 km east and Westover Hills Substation (way 112555981) 1.44 km northwest, both CPS Energy 138 kV. ERCOT's CPS Energy Large Load Additions review (25RPG020) also lists 138 kV line rebuilds Verde Circle - VLSI (~0.26 mi) and Verde Circle - Westover Hills (~2 mi), consistent with these distances.
Note: Already in service: TPIT 70536 is on the Completed tab, status In-Service, ISD 2025-11.
County: the Census county at this point.
Sources: OpenStreetMap: Verde Circle, VLSI, Westover Hills substations (OSM base 2026-11-20) · ERCOT, CPS Energy Large Load Additions Project (25RPG020) independent review update, RPG Feb 2026 (2026-02) · ERCOT TPIT, project 70536 (release 39, 2026-10-01). Map data © OpenStreetMap contributors, available under the Open Database License. Researched by Substation Scout; checked November 21, 2026.
Projects naming this substation
As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| New 138 kV Verde Circle Substation New 138 kV Verde Circle Substation looping into existing 138 kV Westover Hills and VLSI line. ERCOT project 70536 · utility no. S-0971 |
CPS/NO Tier 4 |
In-Service Completed tab |
138 | Nov 2025 actual 2025-11 |
5466 to 5467, 5488 Bexar County |
Verde Circle |
Changes between releases
Where two consecutive releases print different values for these projects (last ten releases).
| Release (data as of) | Project | What changed | Printed values |
|---|---|---|---|
| July 13, 2026 | 70536 | Status as reported | Planned → In-Service |
| June 1, 2026 | 70536 | Moved between tabs | Current-year planned → Completed |
| June 1, 2026 | 70536 | Projected in-service date | Jan 2026 → Nov 2025 |
| February 1, 2026 | 70536 | Projected in-service date | Dec 2025 → Jan 2026 |
| June 1, 2025 | 70536 | Moved between tabs | Future → Current-year planned |
| February 1, 2025 | 70536 | Projected in-service date | May 2025 → Dec 2025 |
| October 1, 2024 | 70536 | Projected in-service date | Mar 2025 → May 2025 |
| June 1, 2024 | 70536 | Projected in-service date | Oct 2024 → Mar 2025 |
Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.
Before relying on any of this
- TPIT lists substation work only where it changes a transmission line or autotransformer rating. A new load-serving substation that changes no rating may never appear in it.
- Every value is the Transmission Service Provider's own statement, compiled by ERCOT. Status and in-service dates are not ERCOT determinations.
- The workbook tab (Future, Current-year planned, Completed, Cancelled) is assigned by ERCOT from dates; the status column is the TSP's word. The two can disagree, and both are shown.
- In ERCOT's competitive areas the company named is the transmission and distribution wires company, not a retail electricity provider or a generator.
- ERCOT publishes the workbook about three times a year, plus occasional updates. A substation that is not listed may simply not be reported yet.
- Substation names are read from the workbook's "from" and "to" terminal columns; for rows with neither, from fixed patterns in the title and description. No language model reads this workbook.
- An entry is a name within a county, not a verified physical facility. A link to a HIFLD record means the names and counties agree exactly, not that the two are confirmed to be one facility.