Substation Scout

Ranchtown

Named in 2 listed projects in ERCOT’s transmission project tracking workbook, in Bexar County. First named in the release with data as of February 1, 2015.

Bexarcounty as printed
138kV
CPS/NOutility
2projects listed

A HIFLD substation record has the same name and county: RANCHTOWN (BEXAR County). The names agree; that does not confirm they are the same facility.

Generation interconnection requests filed in Bexar, TX: ERCOT queue, 22 active of 23. Same county, not the same substation.

Projects naming this substation

As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.

ProjectUtilityStatus as reportedkVProjected in serviceTerminalsSubstations named
Install a 28.57MVAr Capacitor Bank at Ranchtown Substation
ERCOT project 100700 · utility no. S-1042 · RPG 24RPG004
CPS/NO
Tier 2
Planned
Future tab
138 Jan 2028 5358
Bexar County
Ranchtown
CPSE_New_Scenic_Loop_138kV_Load_Serving_Station
The new Scenic Loop 138 kV load serving station will be looped into existing Ranchtown to LCRA (Menger Creek) 138 kV transmission line. The substation should be located south west of the existing Fair Oaks Ranch and north east of the existing Ranchtown substation.
ERCOT project 44946 · utility no. T-0275
CPS/NO
Tier 4
In-Service
Completed tab
138 Dec 2025
actual 2025-12
5363 to 7665, 5358
Bexar County
Ranchtown

Changes between releases

Where two consecutive releases print different values for these projects (last ten releases).

Release (data as of)ProjectWhat changedPrinted values
July 13, 2026100700Projected in-service dateJun 2028 → Jan 2028
July 13, 202644946Status as reportedPlanned → In-Service
June 1, 202644946Moved between tabsCurrent-year planned → Completed
June 1, 202644946Projected in-service dateFeb 2026 → Dec 2025
February 1, 202644946Moved between tabsFuture → Current-year planned
October 1, 2025100700First listedon the Future tab
February 1, 202544946Projected in-service dateJun 2025 → Feb 2026
June 1, 202444946Projected in-service dateMay 2025 → Jun 2025

Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.