Omicron

Named in 3 listed projects in ERCOT’s transmission project tracking workbook, in Bexar County. First named in the release with data as of June 1, 2026.

Bexarcounty as printed
138kV
CPS/NOutility
3projects listed

Described as new. The quoted wording calls this substation new. “New Omicron 138kV Substation” — project 73364 title, as the utility reported it

Reported complete. Project 73364 is on the Completed tab (actual in-service 2025-10), as the utility reported it. That indicates the substation may now be built; it is not a confirmation.

No HIFLD substation record has this name in this county.

Generation interconnection requests filed in Bexar, TX: ERCOT queue, 22 active of 23. Same county, not the same substation.

Location

29.4208, -98.7871 · Bexar County, TX · view on a map

Read off a planning map. Read off a planning map by matching it to roads and other mapped features. Accurate to about ±100 m, as estimated by the research. This is where planning documents put the substation, not a surveyed or built site, and a planned site can move.

How it was located: Symbol anchored: the black rectangle that the legend calls 'Omicron Substation' on the CPS Energy Omicron Transmission Loop rebuild brochure's Project Location Map (TomTom street basemap, 500 ft scale bar). Read at 200 dpi, anchored on the OSM intersections Zeta Dr / Potranco Rd (FM 1957) (29.4212,-98.78618) and Zeta Dr / Theta Dr (29.4171,-98.78599); ~1.5 m/px. The rectangle sits on the south side of FM 1957, ~70 m west of Zeta Dr, at the east end of the red 138 kV line from Rafter Substation (OSM way 639176169, also drawn). +/- ~100 m.

Note: Already in service: TPIT 73364 is on the Completed tab, In-Service, ISD 2025-10 (the 24RPG004 loop to Cagnon-Howard, TPIT 88049, is still Planned for 2028-05). The CPS rectangle falls ~70 m from OSM's 'Texas Research Substation' (way 117089281, CPS Energy 138 kV) and ~170 m east of an unnamed 138 kV CPS substation (way 1533313387); OSM has no feature named Omicron, so whether Omicron shares the Texas Research site or is the unnamed yard is not settled. An OSM-mapped 'VoltaGrid SAT-1' generator plant lies ~700 m south.

County: the Census county at this point.

Sources: CPS Energy, Omicron Transmission Loop Transmission Line Rebuild Project brochure (2025-09), p.2 Project Location Map · ERCOT, CPS Omicron Reliability Project (24RPG004) independent review scope (2024-03) · OpenStreetMap: Zeta Dr, Theta Dr, Potranco Rd (FM 1957), Rafter and Texas Research substations, 138 kV lines (OSM base 2026-11-20) · ERCOT TPIT, projects 73364, 88049, 100695 (release 39, 2026-10-01). Map data © OpenStreetMap contributors, available under the Open Database License. Researched by Substation Scout; checked November 21, 2026.

Projects naming this substation

As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.

ProjectUtilityStatus as reportedkVProjected in serviceTerminalsSubstations named
Install a 50MVAr Capacitor Bank at Omicron Substation
ERCOT project 100695 · utility no. S-1048 · RPG 24RPG004
CPS/NO
Tier 2
Planned
Future tab
138 Dec 2027 5326
Bexar County
Omicron
New Omicron 138kV Substation
New Omicron 138kV Substation will be looped into the existing Cagnon to Rafter 138kV transmission line.
ERCOT project 73364
CPS/NO
Tier 4
In-Service
Completed tab
138 Oct 2025
actual 2025-10
5326 to 5055, 5355
Bexar County
Omicron, Cagnon, Rafter
24RPG004: Omicron Reliability Project : Loop in Cagnon to Howard into Omicron
Install new 138kV double-ckt line (~5 miles) from new Omicron substation to loop into existing Cagnon-Howard line
ERCOT project 88049 · utility no. T-0394 · RPG 24RPG004
CPS/NO
Tier 2
Planned
Future tab
138 May 2028 5326 to 5054, 5230
Bexar County
Omicron

Changes between releases

Where two consecutive releases print different values for these projects (last ten releases).

Release (data as of)ProjectWhat changedPrinted values
July 13, 2026100695Projected in-service dateJun 2029 → Dec 2027
July 13, 202673364Status as reportedPlanned → In-Service
June 1, 202673364Moved between tabsCurrent-year planned → Completed
June 1, 202673364Projected in-service dateFeb 2026 → Oct 2025
February 1, 202673364Projected in-service dateOct 2025 → Feb 2026
October 1, 2025100695First listedon the Future tab
June 1, 202573364Moved between tabsFuture → Current-year planned
February 1, 202573364Projected in-service dateMay 2025 → Oct 2025
October 1, 202473364Projected in-service dateJun 2025 → May 2025
October 1, 202488049First listedon the Future tab
June 1, 202473364Projected in-service dateOct 2025 → Jun 2025

Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.