Omicron
Named in 3 listed projects in ERCOT’s transmission project tracking workbook, in Bexar County. First named in the release with data as of June 1, 2026.
Described as new. The quoted wording calls this substation new. “New Omicron 138kV Substation” — project 73364 title, as the utility reported it
Reported complete. Project 73364 is on the Completed tab (actual in-service 2025-10), as the utility reported it. That indicates the substation may now be built; it is not a confirmation.
No HIFLD substation record has this name in this county.
Generation interconnection requests filed in Bexar, TX: ERCOT queue, 22 active of 23. Same county, not the same substation.
Location
29.4208, -98.7871 · Bexar County, TX · view on a map
Read off a planning map. Read off a planning map by matching it to roads and other mapped features. Accurate to about ±100 m, as estimated by the research. This is where planning documents put the substation, not a surveyed or built site, and a planned site can move.
How it was located: Symbol anchored: the black rectangle that the legend calls 'Omicron Substation' on the CPS Energy Omicron Transmission Loop rebuild brochure's Project Location Map (TomTom street basemap, 500 ft scale bar). Read at 200 dpi, anchored on the OSM intersections Zeta Dr / Potranco Rd (FM 1957) (29.4212,-98.78618) and Zeta Dr / Theta Dr (29.4171,-98.78599); ~1.5 m/px. The rectangle sits on the south side of FM 1957, ~70 m west of Zeta Dr, at the east end of the red 138 kV line from Rafter Substation (OSM way 639176169, also drawn). +/- ~100 m.
Note: Already in service: TPIT 73364 is on the Completed tab, In-Service, ISD 2025-10 (the 24RPG004 loop to Cagnon-Howard, TPIT 88049, is still Planned for 2028-05). The CPS rectangle falls ~70 m from OSM's 'Texas Research Substation' (way 117089281, CPS Energy 138 kV) and ~170 m east of an unnamed 138 kV CPS substation (way 1533313387); OSM has no feature named Omicron, so whether Omicron shares the Texas Research site or is the unnamed yard is not settled. An OSM-mapped 'VoltaGrid SAT-1' generator plant lies ~700 m south.
County: the Census county at this point.
Sources: CPS Energy, Omicron Transmission Loop Transmission Line Rebuild Project brochure (2025-09), p.2 Project Location Map · ERCOT, CPS Omicron Reliability Project (24RPG004) independent review scope (2024-03) · OpenStreetMap: Zeta Dr, Theta Dr, Potranco Rd (FM 1957), Rafter and Texas Research substations, 138 kV lines (OSM base 2026-11-20) · ERCOT TPIT, projects 73364, 88049, 100695 (release 39, 2026-10-01). Map data © OpenStreetMap contributors, available under the Open Database License. Researched by Substation Scout; checked November 21, 2026.
Projects naming this substation
As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| Install a 50MVAr Capacitor Bank at Omicron Substation ERCOT project 100695 · utility no. S-1048 · RPG 24RPG004 |
CPS/NO Tier 2 |
Planned Future tab |
138 | Dec 2027 | 5326 Bexar County |
Omicron |
| New Omicron 138kV Substation New Omicron 138kV Substation will be looped into the existing Cagnon to Rafter 138kV transmission line. ERCOT project 73364 |
CPS/NO Tier 4 |
In-Service Completed tab |
138 | Oct 2025 actual 2025-10 |
5326 to 5055, 5355 Bexar County |
Omicron, Cagnon, Rafter |
| 24RPG004: Omicron Reliability Project : Loop in Cagnon to Howard into Omicron Install new 138kV double-ckt line (~5 miles) from new Omicron substation to loop into existing Cagnon-Howard line ERCOT project 88049 · utility no. T-0394 · RPG 24RPG004 |
CPS/NO Tier 2 |
Planned Future tab |
138 | May 2028 | 5326 to 5054, 5230 Bexar County |
Omicron |
Changes between releases
Where two consecutive releases print different values for these projects (last ten releases).
| Release (data as of) | Project | What changed | Printed values |
|---|---|---|---|
| July 13, 2026 | 100695 | Projected in-service date | Jun 2029 → Dec 2027 |
| July 13, 2026 | 73364 | Status as reported | Planned → In-Service |
| June 1, 2026 | 73364 | Moved between tabs | Current-year planned → Completed |
| June 1, 2026 | 73364 | Projected in-service date | Feb 2026 → Oct 2025 |
| February 1, 2026 | 73364 | Projected in-service date | Oct 2025 → Feb 2026 |
| October 1, 2025 | 100695 | First listed | on the Future tab |
| June 1, 2025 | 73364 | Moved between tabs | Future → Current-year planned |
| February 1, 2025 | 73364 | Projected in-service date | May 2025 → Oct 2025 |
| October 1, 2024 | 73364 | Projected in-service date | Jun 2025 → May 2025 |
| October 1, 2024 | 88049 | First listed | on the Future tab |
| June 1, 2024 | 73364 | Projected in-service date | Oct 2025 → Jun 2025 |
Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.
Before relying on any of this
- TPIT lists substation work only where it changes a transmission line or autotransformer rating. A new load-serving substation that changes no rating may never appear in it.
- Every value is the Transmission Service Provider's own statement, compiled by ERCOT. Status and in-service dates are not ERCOT determinations.
- The workbook tab (Future, Current-year planned, Completed, Cancelled) is assigned by ERCOT from dates; the status column is the TSP's word. The two can disagree, and both are shown.
- In ERCOT's competitive areas the company named is the transmission and distribution wires company, not a retail electricity provider or a generator.
- ERCOT publishes the workbook about three times a year, plus occasional updates. A substation that is not listed may simply not be reported yet.
- Substation names are read from the workbook's "from" and "to" terminal columns; for rows with neither, from fixed patterns in the title and description. No language model reads this workbook.
- An entry is a name within a county, not a verified physical facility. A link to a HIFLD record means the names and counties agree exactly, not that the two are confirmed to be one facility.