Midtown
Named in 1 listed project in ERCOT’s transmission project tracking workbook, in Bexar County. First named in the release with data as of February 1, 2019.
Described as new. The quoted wording calls this substation new. “New Midtown 138kV Substation” — project 45136 title, as the utility reported it
No HIFLD substation record has this name in this county (a record of the same name exists in another county).
Generation interconnection requests filed in Bexar, TX: ERCOT queue, 22 active of 23. Same county, not the same substation.
Location
29.4688, -98.4982 · Bexar County, TX · view on a map
Read off a planning map. Read off a planning map by matching it to roads and other mapped features. Accurate to about ±60 m, as estimated by the research. This is where planning documents put the substation, not a surveyed or built site, and a planned site can move.
How it was located: Symbol anchored: the green cross-hatched 'Recommended Site' polygon inside the black 'Strategic Substation Site' outline on CPS Energy's Midtown 138 kV Substation and Transmission Line Project map (dated 2/13/2020), the site the CPS Energy Board approved on March 2, 2020. Point is the polygon's centroid, read at 150 dpi, anchored on OSM street intersections Belknap Pl / Melrose Pl (29.46944,-98.4974) and Belknap Pl / W Hildebrand Ave (29.46647,-98.4974); Norwood Ct falls 1 px from its OSM latitude as a check. The point lies ~100 m east of the OSM 138 kV line (way 155113065), the map's 'Comal - Olmos' line. +/- ~60 m.
Note: Same station as tracker entry ercot/bexar/mid-town: TPIT 45136 spells it 'Midtown' in the title and 'Mid Town' in the description. TPIT ISD is 2028-05; CPS's December 2025 letter gives a May 2027 construction finish (under construction since 2025).
County: the Census county at this point.
Sources: CPS Energy, Midtown substation project update (Board approval notification) with recommended-site map (2020-03-03), p.3 map · CPS Energy, Midtown Substation Project community update (2025-12-08), p.1 · CPS Energy, Midtown Substation project page (n/a) · OpenStreetMap: Belknap Pl, Melrose Pl, Norwood Ct, W Hildebrand Ave; 138 kV line way 155113065 (OSM base 2026-11-20) · ERCOT TPIT, project 45136 (release 39, 2026-10-01). Map data © OpenStreetMap contributors, available under the Open Database License. Researched by Substation Scout; checked November 21, 2026.
Projects naming this substation
As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| New Midtown 138kV Substation New Mid Town substation looped into Comal St to Olmos transmission line. ERCOT project 45136 · utility no. T-0283 |
CPS/NO Tier 4 |
Planned Future tab |
138 | May 2028 | 5311 to 5096, 5325 Bexar County |
Midtown, Mid Town |
Changes between releases
Where two consecutive releases print different values for these projects (last ten releases).
| Release (data as of) | Project | What changed | Printed values |
|---|---|---|---|
| July 13, 2026 | 45136 | Moved between tabs | Current-year planned → Future |
| July 13, 2026 | 45136 | Projected in-service date | Dec 2026 → May 2028 |
| February 1, 2026 | 45136 | Moved between tabs | Future → Current-year planned |
| October 1, 2025 | 45136 | Projected in-service date | Jun 2026 → Dec 2026 |
| June 1, 2025 | 45136 | Projected in-service date | Mar 2026 → Jun 2026 |
| February 1, 2025 | 45136 | Projected in-service date | Apr 2025 → Mar 2026 |
| June 1, 2024 | 45136 | Projected in-service date | Nov 2024 → Apr 2025 |
Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.
Before relying on any of this
- TPIT lists substation work only where it changes a transmission line or autotransformer rating. A new load-serving substation that changes no rating may never appear in it.
- Every value is the Transmission Service Provider's own statement, compiled by ERCOT. Status and in-service dates are not ERCOT determinations.
- The workbook tab (Future, Current-year planned, Completed, Cancelled) is assigned by ERCOT from dates; the status column is the TSP's word. The two can disagree, and both are shown.
- In ERCOT's competitive areas the company named is the transmission and distribution wires company, not a retail electricity provider or a generator.
- ERCOT publishes the workbook about three times a year, plus occasional updates. A substation that is not listed may simply not be reported yet.
- Substation names are read from the workbook's "from" and "to" terminal columns; for rows with neither, from fixed patterns in the title and description. No language model reads this workbook.
- An entry is a name within a county, not a verified physical facility. A link to a HIFLD record means the names and counties agree exactly, not that the two are confirmed to be one facility.