Midtown

Named in 1 listed project in ERCOT’s transmission project tracking workbook, in Bexar County. First named in the release with data as of February 1, 2019.

Bexarcounty as printed
138kV
CPS/NOutility
1projects listed

Described as new. The quoted wording calls this substation new. “New Midtown 138kV Substation” — project 45136 title, as the utility reported it

No HIFLD substation record has this name in this county (a record of the same name exists in another county).

Generation interconnection requests filed in Bexar, TX: ERCOT queue, 22 active of 23. Same county, not the same substation.

Location

29.4688, -98.4982 · Bexar County, TX · view on a map

Read off a planning map. Read off a planning map by matching it to roads and other mapped features. Accurate to about ±60 m, as estimated by the research. This is where planning documents put the substation, not a surveyed or built site, and a planned site can move.

How it was located: Symbol anchored: the green cross-hatched 'Recommended Site' polygon inside the black 'Strategic Substation Site' outline on CPS Energy's Midtown 138 kV Substation and Transmission Line Project map (dated 2/13/2020), the site the CPS Energy Board approved on March 2, 2020. Point is the polygon's centroid, read at 150 dpi, anchored on OSM street intersections Belknap Pl / Melrose Pl (29.46944,-98.4974) and Belknap Pl / W Hildebrand Ave (29.46647,-98.4974); Norwood Ct falls 1 px from its OSM latitude as a check. The point lies ~100 m east of the OSM 138 kV line (way 155113065), the map's 'Comal - Olmos' line. +/- ~60 m.

Note: Same station as tracker entry ercot/bexar/mid-town: TPIT 45136 spells it 'Midtown' in the title and 'Mid Town' in the description. TPIT ISD is 2028-05; CPS's December 2025 letter gives a May 2027 construction finish (under construction since 2025).

County: the Census county at this point.

Sources: CPS Energy, Midtown substation project update (Board approval notification) with recommended-site map (2020-03-03), p.3 map · CPS Energy, Midtown Substation Project community update (2025-12-08), p.1 · CPS Energy, Midtown Substation project page (n/a) · OpenStreetMap: Belknap Pl, Melrose Pl, Norwood Ct, W Hildebrand Ave; 138 kV line way 155113065 (OSM base 2026-11-20) · ERCOT TPIT, project 45136 (release 39, 2026-10-01). Map data © OpenStreetMap contributors, available under the Open Database License. Researched by Substation Scout; checked November 21, 2026.

Projects naming this substation

As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.

ProjectUtilityStatus as reportedkVProjected in serviceTerminalsSubstations named
New Midtown 138kV Substation
New Mid Town substation looped into Comal St to Olmos transmission line.
ERCOT project 45136 · utility no. T-0283
CPS/NO
Tier 4
Planned
Future tab
138 May 2028 5311 to 5096, 5325
Bexar County
Midtown, Mid Town

Changes between releases

Where two consecutive releases print different values for these projects (last ten releases).

Release (data as of)ProjectWhat changedPrinted values
July 13, 202645136Moved between tabsCurrent-year planned → Future
July 13, 202645136Projected in-service dateDec 2026 → May 2028
February 1, 202645136Moved between tabsFuture → Current-year planned
October 1, 202545136Projected in-service dateJun 2026 → Dec 2026
June 1, 202545136Projected in-service dateMar 2026 → Jun 2026
February 1, 202545136Projected in-service dateApr 2025 → Mar 2026
June 1, 202445136Projected in-service dateNov 2024 → Apr 2025

Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.