Substation Scout

Kingsbridge

Named in 1 listed project in ERCOT’s transmission project tracking workbook, in Bexar County. First named in the release with data as of July 13, 2026.

Bexarcounty as printed
138kV
CPS/NOutility
1projects listed

Described as new. The quoted wording calls this substation new. “New 138kV Kingsbridge Substation” — project 110633 title, as the utility reported it

No HIFLD substation record has this name in this county.

Generation interconnection requests filed in Bexar, TX: ERCOT queue, 22 active of 23. Same county, not the same substation.

Location

Bexar County, TX

On a named line, no point. No point is published. The planning documents place it on the transmission line named in the quote above, and both ends of that line are located. This is where planning documents put the substation, not a surveyed or built site, and a planned site can move.

Note: The Wiseman end of the corridor is itself a new station (map-shown, not yet built), and the Cagnon-Helotes line that Wiseman cuts into is the existing corridor. ERCOT's July 2026 draft also lists a CPS 'Option 4 (Kingsbridge 345-kV Station)' that would make Kingsbridge a 345/138-kV station; the option was not selected as of that draft. ERCOT's study-area maps are schematic, so no point is read from them.

Sources: ERCOT Independent Review update, CPS Energy Large Load Additions Project (25RPG020), RPG February 2026 (2026-02), slide "New Loads Proposed by CPS Energy"; option list · ERCOT status update (draft), combined CPS Energy Large Load Additions (25RPG020) and STEC Medina County Large Load (25RPG046) projects, RPG July 2026 (2026-07-17), p.4 study area map; p.17 Option 4 · OpenStreetMap: CPS Energy Anderson, Westover Hills, Cagnon Road substations (OSM base 2026-11-20) · ERCOT TPIT, project 110633 (release 39, 2026-10-01). Map data © OpenStreetMap contributors, available under the Open Database License. Researched by Substation Scout; checked November 21, 2026.

Projects naming this substation

As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.

ProjectUtilityStatus as reportedkVProjected in serviceTerminalsSubstations named
New 138kV Kingsbridge Substation
ERCOT project 110633 · utility no. T-XXXX
CPS/NO
Tier 4
Planned
Future tab
138 Jan 2031 5246 to 5055, 5487
Bexar County
Kingsbridge

Changes between releases

Where two consecutive releases print different values for these projects (last ten releases).

Release (data as of)ProjectWhat changedPrinted values
July 13, 2026110633Status as reportedConceptual → Planned
July 13, 2026110633Projected in-service dateMay 2032 → Jan 2031
July 13, 2026110633First listedon the Future tab

Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.