Eastside
Named in 2 listed projects in ERCOT’s transmission project tracking workbook, in Bexar County. First named in the release with data as of June 1, 2026.
Described as new. The quoted wording calls this substation new. “New Eastside Switching Station” — project 84898 title, as the utility reported it
Also printed as: Eastside Switching
No HIFLD substation record has this name in this county (a record of the same name exists in another county).
Generation interconnection requests filed in Bexar, TX: ERCOT queue, 22 active of 23. Same county, not the same substation.
Location
Bexar County, TX
County only. A source prints the county; no point is published. This is where planning documents put the substation, not a surveyed or built site, and a planned site can move.
Note: ERCOT's May 2026 board report calls it 'the existing Eastside 345/138-kV substation' (adding an autotransformer), while TPIT 84898 still lists a new Eastside Switching Station, Planned, ISD 2030-01. CPS's public materials (Dec 2024 / Jan 2025 open house) show only a study area and site criteria (about 100 acres, out of floodplain, access to the existing lines); no selected site was published. OSM has no Eastside station; OSM Beck Road Substation (way 174509135) is the reference station, not this one. TPIT's RPG field reads '23RPG032: San Antonio South Reli...'; ERCOT's review documents for this station are the 2024 'CPS Eastside 345/138-kV Switching Station Project' series.
Sources: ERCOT Independent Review, CPS Eastside 345/138-kV Switching Station Project, RPG July 2024 (2024-07-12), slide 5 · CPS Energy, Eastside Switchyard Project page (n/a) · CPS Energy, Eastside Switchyard Project open house displays (2025-01), site requirements; study area map · ERCOT Board item 5.1 (25RPG013/25RPG017) (2026-05-22), p.2 · ERCOT TPIT, projects 84898 and 100676 (release 39, 2026-10-01). Researched by Substation Scout; checked November 21, 2026.
Projects naming this substation
As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| Install a 50MVAr Capacitor Bank at the future Eastside Substation ERCOT project 100676 · utility no. S-1049 · RPG 24RPG004 |
CPS/NO Tier 2 |
Planned Future tab |
138 | Jan 2030 | 5136 Bexar County |
Eastside |
| New Eastside Switching Station ERCOT project 84898 · utility no. T-0399 · RPG 23RPG032: San Antonio South Reli |
CPS Tier 1 |
Planned Future tab |
345 | Jan 2030 | No terminals printed Bexar County |
Eastside Switching |
Changes between releases
Where two consecutive releases print different values for these projects (last ten releases).
| Release (data as of) | Project | What changed | Printed values |
|---|---|---|---|
| July 13, 2026 | 100676 | Projected in-service date | Jun 2029 → Jan 2030 |
| July 13, 2026 | 84898 | Projected in-service date | Jun 2029 → Jan 2030 |
| October 1, 2025 | 100676 | First listed | on the Future tab |
| June 1, 2024 | 84898 | First listed | on the Future tab |
Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.
Before relying on any of this
- TPIT lists substation work only where it changes a transmission line or autotransformer rating. A new load-serving substation that changes no rating may never appear in it.
- Every value is the Transmission Service Provider's own statement, compiled by ERCOT. Status and in-service dates are not ERCOT determinations.
- The workbook tab (Future, Current-year planned, Completed, Cancelled) is assigned by ERCOT from dates; the status column is the TSP's word. The two can disagree, and both are shown.
- In ERCOT's competitive areas the company named is the transmission and distribution wires company, not a retail electricity provider or a generator.
- ERCOT publishes the workbook about three times a year, plus occasional updates. A substation that is not listed may simply not be reported yet.
- Substation names are read from the workbook's "from" and "to" terminal columns; for rows with neither, from fixed patterns in the title and description. No language model reads this workbook.
- An entry is a name within a county, not a verified physical facility. A link to a HIFLD record means the names and counties agree exactly, not that the two are confirmed to be one facility.