Peters
Named in 2 listed projects in ERCOT’s transmission project tracking workbook, in Austin County. First named in the release with data as of October 1, 2016.
Expansion at an existing substation: new or expanded yard. The quoted wording describes a new or expanded yard, bus, bay or station at this substation. “Expand Peters 138kV substation” — project 76622, as the utility reported it
No HIFLD substation record has this name in this county.
Generation interconnection requests filed in Austin, TX: ERCOT queue, 14 active of 14. Same county, not the same substation.
Projects naming this substation
As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| Bellville South - Peters Transmission Line Upgrade Upgrade Bellville South – Peters Transmission Line to 4000A minimum (T217) as an LCP project for Batch Zero Base Load ERCOT project 109910 |
LCRATSC Tier 4 |
Conceptual Future tab |
138 | Dec 2031 | Bellville South to Peters Austin County |
Bellville South, Peters |
| Expand Peters 138kV substation for Walstrom BESS (22INR0540). ERCOT project 76622 |
CNP Tier 4 |
In-Service Completed tab |
138 | Feb 2025 actual 2025-02 |
No terminals printed Austin County |
Peters |
Changes between releases
Where two consecutive releases print different values for these projects (last ten releases).
| Release (data as of) | Project | What changed | Printed values |
|---|---|---|---|
| July 13, 2026 | 109910 | First listed | on the Future tab |
| October 1, 2025 | 76622 | Status as reported | Planned → In-Service |
| June 1, 2025 | 76622 | Moved between tabs | Future → Completed |
| October 1, 2024 | 76622 | Projected in-service date | May 2025 → Feb 2025 |
Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.
Before relying on any of this
- TPIT lists substation work only where it changes a transmission line or autotransformer rating. A new load-serving substation that changes no rating may never appear in it.
- Every value is the Transmission Service Provider's own statement, compiled by ERCOT. Status and in-service dates are not ERCOT determinations.
- The workbook tab (Future, Current-year planned, Completed, Cancelled) is assigned by ERCOT from dates; the status column is the TSP's word. The two can disagree, and both are shown.
- In ERCOT's competitive areas the company named is the transmission and distribution wires company, not a retail electricity provider or a generator.
- ERCOT publishes the workbook about three times a year, plus occasional updates. A substation that is not listed may simply not be reported yet.
- Substation names are read from the workbook's "from" and "to" terminal columns; for rows with neither, from fixed patterns in the title and description. No language model reads this workbook.
- An entry is a name within a county, not a verified physical facility. A link to a HIFLD record means the names and counties agree exactly, not that the two are confirmed to be one facility.