Bellville South
Named in 3 listed projects in ERCOT’s transmission project tracking workbook, in Austin County. First named in the release with data as of October 1, 2017.
A HIFLD substation record has the same name and county: BELLVILLE SOUTH (AUSTIN County). The names agree; that does not confirm they are the same facility.
Generation interconnection requests filed in Austin, TX: ERCOT queue, 14 active of 14. Same county, not the same substation.
Projects naming this substation
As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| Bellville South - Peters Transmission Line Upgrade Upgrade Bellville South – Peters Transmission Line to 4000A minimum (T217) as an LCP project for Batch Zero Base Load ERCOT project 109910 |
LCRATSC Tier 4 |
Conceptual Future tab |
138 | Dec 2031 | Bellville South to Peters Austin County |
Bellville South, Peters |
| Bellville South - Glidden Transmission Line Upgrade Upgrade Bellville South – Glidden Transmission Line to 4000A minimum (T113) as an LCP project for Batch Zero Base Load ERCOT project 109912 |
LCRATSC Tier 4 |
Conceptual Future tab |
138 | Dec 2031 | Bellville South to Glidden Austin / Colorado County |
Bellville South, Glidden |
| Bellville South - Prairie View Transmission Line Upgrade the proposed project converts the existing 69kV transmission line T283 from Bellville South- Quanex Sw - Sunnyside - Prarie View substation to 138kV. The proposed project improves the reliabiltiy of transmission facilities on the 26.1 mile transmission line and increases the line capacity for long term system growth. ERCOT project 72956 |
STEC Tier 3 |
Conceptual Future tab |
69 | May 2028 | Bellville South to Prairie View Austin / Waller County |
Bellville South, Prairie View |
Changes between releases
Where two consecutive releases print different values for these projects (last ten releases).
| Release (data as of) | Project | What changed | Printed values |
|---|---|---|---|
| July 13, 2026 | 109910 | First listed | on the Future tab |
| July 13, 2026 | 109912 | First listed | on the Future tab |
| February 1, 2026 | 72956 | Projected in-service date | May 2031 → May 2028 |
Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.
Before relying on any of this
- TPIT lists substation work only where it changes a transmission line or autotransformer rating. A new load-serving substation that changes no rating may never appear in it.
- Every value is the Transmission Service Provider's own statement, compiled by ERCOT. Status and in-service dates are not ERCOT determinations.
- The workbook tab (Future, Current-year planned, Completed, Cancelled) is assigned by ERCOT from dates; the status column is the TSP's word. The two can disagree, and both are shown.
- In ERCOT's competitive areas the company named is the transmission and distribution wires company, not a retail electricity provider or a generator.
- ERCOT publishes the workbook about three times a year, plus occasional updates. A substation that is not listed may simply not be reported yet.
- Substation names are read from the workbook's "from" and "to" terminal columns; for rows with neither, from fixed patterns in the title and description. No language model reads this workbook.
- An entry is a name within a county, not a verified physical facility. A link to a HIFLD record means the names and counties agree exactly, not that the two are confirmed to be one facility.