Bellville South

Named in 3 listed projects in ERCOT’s transmission project tracking workbook, in Austin County. First named in the release with data as of October 1, 2017.

Austincounty as printed
69, 138kV
LCRATSC, STECutility
3projects listed

A HIFLD substation record has the same name and county: BELLVILLE SOUTH (AUSTIN County). The names agree; that does not confirm they are the same facility.

Generation interconnection requests filed in Austin, TX: ERCOT queue, 14 active of 14. Same county, not the same substation.

Projects naming this substation

As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.

ProjectUtilityStatus as reportedkVProjected in serviceTerminalsSubstations named
Bellville South - Peters Transmission Line Upgrade
Upgrade Bellville South – Peters Transmission Line to 4000A minimum (T217) as an LCP project for Batch Zero Base Load
ERCOT project 109910
LCRATSC
Tier 4
Conceptual
Future tab
138 Dec 2031 Bellville South to Peters
Austin County
Bellville South, Peters
Bellville South - Glidden Transmission Line Upgrade
Upgrade Bellville South – Glidden Transmission Line to 4000A minimum (T113) as an LCP project for Batch Zero Base Load
ERCOT project 109912
LCRATSC
Tier 4
Conceptual
Future tab
138 Dec 2031 Bellville South to Glidden
Austin / Colorado County
Bellville South, Glidden
Bellville South - Prairie View Transmission Line Upgrade
the proposed project converts the existing 69kV transmission line T283 from Bellville South- Quanex Sw - Sunnyside - Prarie View substation to 138kV. The proposed project improves the reliabiltiy of transmission facilities on the 26.1 mile transmission line and increases the line capacity for long term system growth.
ERCOT project 72956
STEC
Tier 3
Conceptual
Future tab
69 May 2028 Bellville South to Prairie View
Austin / Waller County
Bellville South, Prairie View

Changes between releases

Where two consecutive releases print different values for these projects (last ten releases).

Release (data as of)ProjectWhat changedPrinted values
July 13, 2026109910First listedon the Future tab
July 13, 2026109912First listedon the Future tab
February 1, 202672956Projected in-service dateMay 2031 → May 2028

Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.