Named in 1 listed project in ERCOT’s transmission project tracking workbook, in Atascosa County. First named in the release with data as of February 1, 2015.
Described as new. The quoted wording calls this substation new. “Loxley: Construct New 138 kV Station” — project 80486 title, as the utility reported it
Reported complete. Project 80486 is on the Completed tab (actual in-service 2025-12), as the utility reported it. That indicates the substation may now be built; it is not a confirmation.
No HIFLD substation record has this name in this county.
Generation interconnection requests filed in Atascosa, TX: ERCOT queue, 17 active of 17. Same county, not the same substation.
Location
Atascosa County, TX
On a named line, no point. No point is published. The planning documents place it on the transmission line named in the quote above, and both ends of that line are located. This is where planning documents put the substation, not a surveyed or built site, and a planned site can move.
Note: Probably already in service: TPIT 80486 is on the Completed tab (status field 'Planned', ISD 2025-10). Not tagged in OSM by name.
Sources: ERCOT TPIT, project 80486 (release 39, 2026-10-01) · OpenStreetMap: AEP Pleasanton and CPS Energy Trumbo substations (OSM base 2026-11-20). Map data © OpenStreetMap contributors, available under the Open Database License. Researched by Substation Scout; checked November 21, 2026.
Projects naming this substation
As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| Loxley: Construct New 138 kV Station Interconnect the Loxley load to the new Loxley 138 kV station on the Pleasanton to Trumbo 138 kV line ERCOT project 80486 |
AEP TCC Tier 4 |
Planned Completed tab |
138 | Oct 2025 actual 2025-12 |
Loxley Atascosa County |
Loxley |
Changes between releases
Where two consecutive releases print different values for these projects (last ten releases).
| Release (data as of) | Project | What changed | Printed values |
|---|---|---|---|
| February 1, 2026 | 80486 | Moved between tabs | Current-year planned → Completed |
| June 1, 2025 | 80486 | Moved between tabs | Future → Current-year planned |
| June 1, 2024 | 80486 | First listed | on the Future tab |
Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.
Before relying on any of this
- TPIT lists substation work only where it changes a transmission line or autotransformer rating. A new load-serving substation that changes no rating may never appear in it.
- Every value is the Transmission Service Provider's own statement, compiled by ERCOT. Status and in-service dates are not ERCOT determinations.
- The workbook tab (Future, Current-year planned, Completed, Cancelled) is assigned by ERCOT from dates; the status column is the TSP's word. The two can disagree, and both are shown.
- In ERCOT's competitive areas the company named is the transmission and distribution wires company, not a retail electricity provider or a generator.
- ERCOT publishes the workbook about three times a year, plus occasional updates. A substation that is not listed may simply not be reported yet.
- Substation names are read from the workbook's "from" and "to" terminal columns; for rows with neither, from fixed patterns in the title and description. No language model reads this workbook.
- An entry is a name within a county, not a verified physical facility. A link to a HIFLD record means the names and counties agree exactly, not that the two are confirmed to be one facility.