Watermelon
In the Arizona Public Service ten-year transmission plan filed with the Arizona Corporation Commission.
Described as new. The quoted wording calls this substation proposed or future. “traverse east to the proposed Watermelon substation.” — APS 2026-2035 Ten Year Transmission Plan, p.45
Also mentioned: “The Watermelon substation is proposed east of Arizona State Highway 85 and North of Maricopa Rd” — APS 2026-2035 Ten Year Transmission Plan, p.45 · “Watermelon substation (in-service TBD)” — APS 2026-2035 Ten Year Transmission Plan, p.40
Note. The Desert Sun sheet (p.45) prints "Watermelon 230kV substation (in-service 2030)"; the Panda to Freedom #2 sheet (p.40) prints "(in-service TBD)". 500kV lines from Desert Sun and to Jojoba also terminate there.
No county is printed for this substation in the plan or in a Line Siting Committee docket found for it.
Location
33.0117, -112.6282 · Maricopa County, AZ · view on a map
Read off a planning map. Read off a planning map by matching it to roads and other mapped features. Accurate to about ±500 m, as estimated by the research. This is where planning documents put the substation, not a surveyed or built site, and a planned site can move.
How it was located: Symbol anchored: the green Future Substation triangle labelled "WATERMELON SUBSTATION" on APS's Desert Sun Transmission Project Preliminary Route Alternatives (Conceptual) map (1:66,000, updated 7/28/2026). Affine fit on three existing-substation triangles placed on their OSM/HIFLD yards: Solana (32.92162, -112.97800), Gila Bend (32.94039, -112.75933) and Panda (OSM 230 kV yard at 32.97331, -112.68998); fitted scale 18.2 x 18.6 m per displayed px; check: the map's Watermelon Rd falls 65-100 m north of OSM Watermelon Road at two places. ±500 m: the map is conceptual ("Routes shown are not final") and the yard's footprint is not drawn.
County: the Census county at this point.
Sources: APS 2026-2035 Ten Year Transmission Plan (Arizona Public Service Company), ACC Docket E-99999A-25-0006 (A.R.S. 40-360.02 ten-year plans) (filed 2026-01-30), p.45 · APS Desert Sun Transmission Project, Preliminary Route Alternatives (Conceptual) map (SWCA, 1:66,000, updated 7/28/2026), on the project page aps.com/desertsunline (updated 2026-07-28), map image · APS Desert Sun Transmission Project newsletter, August 2026 (August 2026), p.1 · OpenStreetMap: Watermelon Road, Maricopa Road, SR 85; Panda, Gila Bend, Solana yards (OSM base 2026-11-21). Map data © OpenStreetMap contributors, available under the Open Database License. Researched by Substation Scout; checked November 21, 2026.
The project in the plan
| Project | Where in the plan | Line siting case |
|---|---|---|
| Desert Sun 230kV and 500kV Interconnections | p.45 | Not printed |
Generation interconnection requests filed in Maricopa, AZ: APS queue, 82 active of 259. Same county, not the same substation.
Source: the utilities’ ten-year transmission plans filed with the Arizona Corporation Commission under A.R.S. 40-360.02, docket E-99999A-25-0006: APS 2026-2035 Ten Year Transmission Plan (filed January 30, 2026); TEP 2026-2035 Ten-Year Transmission Plan (filed January 30, 2026); UNS Electric 2026-2035 Ten-Year Transmission Plan (filed January 30, 2026); SRP 2026-2035 Ten Year Plan (filed January 29, 2026); SRP supplement to the 2026-2035 Ten Year Plan (filed August 13, 2026); Arizona G&T Cooperatives 2026-2035 Ten Year Plan (filed January 30, 2026). Retrieved 2026-11-20; records reviewed by hand 2026-11-20.
Before relying on any of this
- No Arizona ten-year plan prints a county for a substation. A county shown here is printed for that station in the plan or in a Line Siting Committee docket; otherwise it is left blank.
- The plans are scanned images with an OCR text layer. Quotes are copied from that layer; where it misspells a name, the page says so.
- An in-service date is the year the plan prints, not a construction schedule.