Watermelon

In the Arizona Public Service ten-year transmission plan filed with the Arizona Corporation Commission.

—county (not printed)
500, 230kV as printed
APSutility plan
2030in service, as printed

Described as new. The quoted wording calls this substation proposed or future. “traverse east to the proposed Watermelon substation.” — APS 2026-2035 Ten Year Transmission Plan, p.45

Also mentioned: “The Watermelon substation is proposed east of Arizona State Highway 85 and North of Maricopa Rd” — APS 2026-2035 Ten Year Transmission Plan, p.45 · “Watermelon substation (in-service TBD)” — APS 2026-2035 Ten Year Transmission Plan, p.40

Note. The Desert Sun sheet (p.45) prints "Watermelon 230kV substation (in-service 2030)"; the Panda to Freedom #2 sheet (p.40) prints "(in-service TBD)". 500kV lines from Desert Sun and to Jojoba also terminate there.

No county is printed for this substation in the plan or in a Line Siting Committee docket found for it.

Location

33.0117, -112.6282 · Maricopa County, AZ · view on a map

Read off a planning map. Read off a planning map by matching it to roads and other mapped features. Accurate to about ±500 m, as estimated by the research. This is where planning documents put the substation, not a surveyed or built site, and a planned site can move.

How it was located: Symbol anchored: the green Future Substation triangle labelled "WATERMELON SUBSTATION" on APS's Desert Sun Transmission Project Preliminary Route Alternatives (Conceptual) map (1:66,000, updated 7/28/2026). Affine fit on three existing-substation triangles placed on their OSM/HIFLD yards: Solana (32.92162, -112.97800), Gila Bend (32.94039, -112.75933) and Panda (OSM 230 kV yard at 32.97331, -112.68998); fitted scale 18.2 x 18.6 m per displayed px; check: the map's Watermelon Rd falls 65-100 m north of OSM Watermelon Road at two places. ±500 m: the map is conceptual ("Routes shown are not final") and the yard's footprint is not drawn.

County: the Census county at this point.

Sources: APS 2026-2035 Ten Year Transmission Plan (Arizona Public Service Company), ACC Docket E-99999A-25-0006 (A.R.S. 40-360.02 ten-year plans) (filed 2026-01-30), p.45 · APS Desert Sun Transmission Project, Preliminary Route Alternatives (Conceptual) map (SWCA, 1:66,000, updated 7/28/2026), on the project page aps.com/desertsunline (updated 2026-07-28), map image · APS Desert Sun Transmission Project newsletter, August 2026 (August 2026), p.1 · OpenStreetMap: Watermelon Road, Maricopa Road, SR 85; Panda, Gila Bend, Solana yards (OSM base 2026-11-21). Map data © OpenStreetMap contributors, available under the Open Database License. Researched by Substation Scout; checked November 21, 2026.

The project in the plan

ProjectWhere in the planLine siting case
Desert Sun 230kV and 500kV Interconnectionsp.45Not printed

Generation interconnection requests filed in Maricopa, AZ: APS queue, 82 active of 259. Same county, not the same substation.

Source: the utilities’ ten-year transmission plans filed with the Arizona Corporation Commission under A.R.S. 40-360.02, docket E-99999A-25-0006: APS 2026-2035 Ten Year Transmission Plan (filed January 30, 2026); TEP 2026-2035 Ten-Year Transmission Plan (filed January 30, 2026); UNS Electric 2026-2035 Ten-Year Transmission Plan (filed January 30, 2026); SRP 2026-2035 Ten Year Plan (filed January 29, 2026); SRP supplement to the 2026-2035 Ten Year Plan (filed August 13, 2026); Arizona G&T Cooperatives 2026-2035 Ten Year Plan (filed January 30, 2026). Retrieved 2026-11-20; records reviewed by hand 2026-11-20.

Before relying on any of this

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first