Santa Rita
In the Tucson Electric Power ten-year transmission plan filed with the Arizona Corporation Commission, in Pima County.
Described as new. The quoted wording calls this substation proposed or future. “Planned Santa Rita 138-kV Substation” — TEP 2026-2035 Ten-Year Transmission Plan, p.52
Also mentioned: “Planned Santa Rita Substation” — TEP 2026-2035 Ten-Year Transmission Plan, p.53 · “Planned Santa Rita 138-kV Substation” — TEP 2026-2035 Ten-Year Transmission Plan, p.59
Note. The plan's project title says Santa Rita was formerly called Hartt.
Note. The Sonoran - Santa Rita 138-kV line (p.59, in service 2029) also terminates here; its CEC is Line Siting Case No. 261.
County: “terminating at the planned Santa Rita substation (section 29, township 17 s, range 14 e), each located within Pima County, Arizona.” — ACC eDocket, Line Siting docket L-00000C-26-0125-00261, docket description, retrieved 2026-11-20.
Location
31.9140, -110.9322 · Pima County, AZ · view on a map
Read off a planning map. Read off a planning map by matching it to roads and other mapped features. Accurate to about ±300 m, as estimated by the research. This is where planning documents put the substation, not a surveyed or built site, and a planned site can move.
How it was located: Symbol anchored: the yellow triangle "Planned 138kV Substation" labeled "Santa Rita" on Exhibit A of the Case 261 CEC (approved corridor map, 1 inch = ~1 mile). Georeferenced on the BLM PLSS grid printed on the map: the triangle sits on the Corto Road alignment (south line of Section 29 T17S R14E, 31.9138), about 0.29 mi west of the Country Club Road alignment (east line of Section 29, -110.9272). The CEC text agrees: Route 3 runs "west for approximately 0.2 miles" along the Corto Road alignment to the substation site, and the map callout says "west 0.25 miles". Accuracy ±300 m.
Note: The Case 261 CEC body says "TEP's planned Santa Rita Substation in Santa Cruz County", while its caption and the docket print Section 29 T17S R14E "located within Pima County"; BLM PLSS puts that section wholly in Pima County, and the map-shown point is in Pima. The record keeps Pima.
Sources: Tucson Electric Power, Ten Year Plan 2026-2035, Transmission Projects (filed with the Arizona Corporation Commission, image E000049050) (plan years 2026-2035), p.52 · Tucson Electric Power, Ten Year Plan 2026-2035, Transmission Projects (filed with the Arizona Corporation Commission, image E000049050) (plan years 2026-2035), p.59 · ACC eDocket, Line Siting docket L-00000C-26-0125-00261 (Case No. 261): Santa Rita Connection 138 kV Transmission Line Project (n/a (retrieved 2026-11-20)), docket description · Line-Siting Certificate of Environmental Compatibility, Case No. 261 (Santa Rita Connection), with Exhibit A map (docketed 2026-06-03), pp.2-4 · BLM PLSS CadNSDI, section polygons (with Census TIGERweb county polygons) (n/a (retrieved 2026-11-20)), layer 2. Researched by Substation Scout; checked November 21, 2026.
The project in the plan
| Project | Where in the plan | Line siting case |
|---|---|---|
| Loop-In of South - Green Valley 138-kV Transmission Line into Planned Santa Rita (formerly Hartt) 138-kV Substation | p.52 | Not printed |
Generation interconnection requests filed in Pima, AZ: APS queue, 2 active of 2. Same county, not the same substation.
Source: the utilities’ ten-year transmission plans filed with the Arizona Corporation Commission under A.R.S. 40-360.02, docket E-99999A-25-0006: APS 2026-2035 Ten Year Transmission Plan (filed January 30, 2026); TEP 2026-2035 Ten-Year Transmission Plan (filed January 30, 2026); UNS Electric 2026-2035 Ten-Year Transmission Plan (filed January 30, 2026); SRP 2026-2035 Ten Year Plan (filed January 29, 2026); SRP supplement to the 2026-2035 Ten Year Plan (filed August 13, 2026); Arizona G&T Cooperatives 2026-2035 Ten Year Plan (filed January 30, 2026). Retrieved 2026-11-20; records reviewed by hand 2026-11-20.
Before relying on any of this
- No Arizona ten-year plan prints a county for a substation. A county shown here is printed for that station in the plan or in a Line Siting Committee docket; otherwise it is left blank.
- The plans are scanned images with an OCR text layer. Quotes are copied from that layer; where it misspells a name, the page says so.
- An in-service date is the year the plan prints, not a construction schedule.