Raptor
In the Arizona Public Service ten-year transmission plan filed with the Arizona Corporation Commission.
Described as new. The quoted wording calls this substation proposed or future. “The future Raptor switchyard will connect into the line along this alignment.” — APS 2026-2035 Ten Year Transmission Plan, p.25
Note. APS's CEC 198 compliance filing (ACC image E000055854, 2026-11-18) says "Construction is mostly complete", with service expected in March 2027; the plan prints 2026.
Also mentioned: “Decision No. 81563 further amended the CEC authorizing the addition of the Raptor switchyard to serve a large-load customer.” — APS 2026-2035 Ten Year Transmission Plan, p.25
Note. The plan says the switchyard was added (Decision No. 81563, 11/21/2025) "to serve a large-load customer".
No county is printed for this substation in the plan or in a Line Siting Committee docket found for it.
Location
33.5735, -112.3305 · Maricopa County, AZ · view on a map
Read off a planning map. Read off a planning map by matching it to roads and other mapped features. Accurate to about ±150 m, as estimated by the research. This is where planning documents put the substation, not a surveyed or built site, and a planned site can move.
How it was located: Symbol anchored: the drawn Project Siting Area outline (blue square, ~230 m a side) on APS's Exhibit C "Planned Raptor Switchyard" map, the area in which APS builds the Raptor Switchyard and the customer's 230 kV substation. The map is aerial-based with a 0.5-mile scale bar; affine fit on OSM road anchors Dysart Road x Peoria Avenue (33.58010, -112.34182), El Mirage Road x Peoria Avenue (33.57997, -112.32464) and Dysart Road x W Joe R Ramirez Road (33.57262, -112.34169); fitted scale 1.94-1.97 m/px, matching the scale bar. Point is the square's centre. OSM maps an unnamed power=substation (way 1529510645, 33.5731-33.5747 N, 112.3307-112.3291 W) inside the square, centred within ~30 m of the read. ±150 m (siting area half-width plus reading); the map draws the siting area, not the yard itself.
County: the Census county at this point.
Sources: APS 2026-2035 Ten Year Transmission Plan (Arizona Public Service Company), ACC Docket E-99999A-25-0006 (A.R.S. 40-360.02 ten-year plans) (filed 2026-01-30), p.25 · APS Application to Amend Decision No. 78543 (CEC 198), Raptor Switchyard, Docket L-00000D-22-0030-00198, with Exhibit C map and Exhibit D (Chaulk declaration) (filed 2025-10-14), Exhibit C · APS CEC 198 annual compliance filing, Decision No. 78543 (filed 2026-11-18), p.2 · OpenStreetMap: Dysart Road, El Mirage Road, Peoria Avenue, W Joe R Ramirez Road; unnamed substation way 1529510645 (OSM base 2026-11-21). Map data © OpenStreetMap contributors, available under the Open Database License. Researched by Substation Scout; checked November 21, 2026.
The project in the plan
| Project | Where in the plan | Line siting case |
|---|---|---|
| Contrail 230kV Lines | p.25 | CEC 198 |
Generation interconnection requests filed in Maricopa, AZ: APS queue, 82 active of 259. Same county, not the same substation.
Source: the utilities’ ten-year transmission plans filed with the Arizona Corporation Commission under A.R.S. 40-360.02, docket E-99999A-25-0006: APS 2026-2035 Ten Year Transmission Plan (filed January 30, 2026); TEP 2026-2035 Ten-Year Transmission Plan (filed January 30, 2026); UNS Electric 2026-2035 Ten-Year Transmission Plan (filed January 30, 2026); SRP 2026-2035 Ten Year Plan (filed January 29, 2026); SRP supplement to the 2026-2035 Ten Year Plan (filed August 13, 2026); Arizona G&T Cooperatives 2026-2035 Ten Year Plan (filed January 30, 2026). Retrieved 2026-11-20; records reviewed by hand 2026-11-20.
Before relying on any of this
- No Arizona ten-year plan prints a county for a substation. A county shown here is printed for that station in the plan or in a Line Siting Committee docket; otherwise it is left blank.
- The plans are scanned images with an OCR text layer. Quotes are copied from that layer; where it misspells a name, the page says so.
- An in-service date is the year the plan prints, not a construction schedule.