Port
In the Tucson Electric Power ten-year transmission plan filed with the Arizona Corporation Commission, in Pima County.
Described as new. The quoted wording calls this substation proposed or future. “Planned Port 138-kV Substation” — TEP 2026-2035 Ten-Year Transmission Plan, p.46
Also mentioned: “planned Port 138/13.8-kV Substation to the TEP transmission” — TEP 2026-2035 Ten-Year Transmission Plan, p.46
Note. Phase 3 of the project: loop-in of the Irvington - Patriot line to Port Substation, in service 2028.
County: “with an interconnection at the Port Substation (Section 18, Township 15 South, Range 15 East) and the Patriot Substation (Section 31, Township 14 South, Range 15 East), and terminating at the East Loop Substation (Section 08, Township 14 South, Range 15 East, each located within Pima County, Arizona.” — ACC eDocket, Line Siting docket L-00000C-20-0007-00186, docket description, retrieved 2026-11-20.
Location
32.1337, -110.8486 · Pima County, AZ · view on a map
OpenStreetMap, corroborated. An OpenStreetMap feature carries this exact name, and a cited source agrees. Accurate to about ±300 m, as estimated by the research. This is where planning documents put the substation, not a surveyed or built site, and a planned site can move.
How it was located: OpenStreetMap way 1450176934, name "Port Substation", power=substation, voltage 138000, with the OSM note "current temporary substation that will be permanent at some point" (added 2025-11); point is the centroid of the small mapped yard. Corroborated by TEP's CEC application: Port "will be located on private land near South Kolb and East Valencia roads at the Port of Tucson" on a 10-acre parcel, with the route running east along the Littletown Road alignment to it; the mapped yard is on the Littletown Road alignment about 0.7 km west of Kolb Road. Accuracy ±300 m because the mapped yard may be a temporary installation and the permanent 10-acre station is not drawn.
Note: OSM (a contributor note, not a TEP source) describes the mapped yard as a temporary substation; the plan dates the Port loop-in to 2028. If a temporary station is energized, Port may already partly exist.
Sources: Tucson Electric Power, Ten Year Plan 2026-2035, Transmission Projects (filed with the Arizona Corporation Commission, image E000049050) (plan years 2026-2035), p.46 · ACC eDocket, Line Siting docket L-00000C-20-0007-00186 (Case No. 186): Irvington to East Loop 138 kV Transmission Line Project (n/a (retrieved 2026-11-20)), docket description · TEP CEC Application, Irvington to East Loop 138 kV Transmission Line Project (Case No. 186) (January 2020 (filed 2020-01-15)), PDF p.23 · OpenStreetMap: way 1450176934 "Port Substation" and Littletown / Kolb roads (OSM base 2026-11-21). Map data © OpenStreetMap contributors, available under the Open Database License. Researched by Substation Scout; checked November 21, 2026.
The project in the plan
| Project | Where in the plan | Line siting case |
|---|---|---|
| Irvington 138-kV Substation - East Loop 138-kV Substation Transmission Line with loop-in at the Planned Patriot 138-kV Substation and Planned Port 138-kV Substation | p.46 | Case No. 186 |
Generation interconnection requests filed in Pima, AZ: APS queue, 2 active of 2. Same county, not the same substation.
Source: the utilities’ ten-year transmission plans filed with the Arizona Corporation Commission under A.R.S. 40-360.02, docket E-99999A-25-0006: APS 2026-2035 Ten Year Transmission Plan (filed January 30, 2026); TEP 2026-2035 Ten-Year Transmission Plan (filed January 30, 2026); UNS Electric 2026-2035 Ten-Year Transmission Plan (filed January 30, 2026); SRP 2026-2035 Ten Year Plan (filed January 29, 2026); SRP supplement to the 2026-2035 Ten Year Plan (filed August 13, 2026); Arizona G&T Cooperatives 2026-2035 Ten Year Plan (filed January 30, 2026). Retrieved 2026-11-20; records reviewed by hand 2026-11-20.
Before relying on any of this
- No Arizona ten-year plan prints a county for a substation. A county shown here is printed for that station in the plan or in a Line Siting Committee docket; otherwise it is left blank.
- The plans are scanned images with an OCR text layer. Quotes are copied from that layer; where it misspells a name, the page says so.
- An in-service date is the year the plan prints, not a construction schedule.