Parkway

In the Arizona Public Service ten-year transmission plan filed with the Arizona Corporation Commission.

—county (not printed)
230, 69kV as printed
APSutility plan
—in service, as printed

Described as new. The quoted wording calls this substation proposed or future. “the future Parkway substation” — APS 2026-2035 Ten Year Transmission Plan, p.25

Note. Probably built. The plan lists "The Parkway 230kV Lines project" among projects placed in service in 2025 (p.14), while the Contrail 230kV Lines routing (p.25) still calls Parkway a future substation. It stays listed here because the plan describes it so.

Also mentioned: “Parkway 230/69kV Transformer Addition (1 unit)” — APS 2026-2035 Ten Year Transmission Plan, p.10

Note. Point of Termination of the Contrail 230kV Lines (p.25), which the plan says serve "high-load customers in the area".

No county is printed for this substation in the plan or in a Line Siting Committee docket found for it.

Location

Maricopa County, AZ

County of the land section printed for it. A filing prints the section, township and range for this substation, and that one-square-mile section lies in one county. No point is published. This is where planning documents put the substation, not a surveyed or built site, and a planned site can move.

How it was located: No point. Section level only (a square mile). Lead not adopted: OSM has an unnamed power=substation polygon (way 1425466084, 33.5669-33.5698 N, 112.4218-112.4195 W) at the northwest corner of Loop 303 and Olive Avenue, inside that section; it carries no name, so it is not a point here.

Note: Tracker finding: probably built. The plan lists "The Parkway 230kV Lines project" among projects placed in service in 2025 (p.14) while the Contrail sheet (p.25) still calls Parkway "the future Parkway substation". OSM maps an unnamed substation where the TS2 siting area is printed. Former name TS2 (APS declaration, CEC 198 docket).

County: the filing prints “"the northwest comer of the Loop 303 and Olive Avenue in Section 25 in Township 3 North, Range 2 West" (TS2 substation siting area, authorized in CEC 122; now Parkway)”, a section in Maricopa County.

Sources: APS 2026-2035 Ten Year Transmission Plan (Arizona Public Service Company), ACC Docket E-99999A-25-0006 (A.R.S. 40-360.02 ten-year plans) (filed 2026-01-30), p.25 · APS Application to Amend Decision No. 78543 (CEC 198, West Valley Central), Sabre Switchyard, Docket L-00000D-22-0030-00198, with Exhibit A (CEC 198 corridor description) and Exhibit D (Chaulk declaration) (filed 2024-06-06), Exhibit A Corridor Description, Route A; Exhibit D para. 3 · BLM National PLSS CadNSDI (PLSS Township and Section layers), section polygon lookup (n/a (queried 2026-11-21)), layers 1-2. Researched by Substation Scout; checked November 21, 2026.

The project in the plan

ProjectWhere in the planLine siting case
Contrail 230kV Linesp.25CEC 198

Generation interconnection requests filed in Maricopa, AZ: APS queue, 82 active of 259. Same county, not the same substation.

Source: the utilities’ ten-year transmission plans filed with the Arizona Corporation Commission under A.R.S. 40-360.02, docket E-99999A-25-0006: APS 2026-2035 Ten Year Transmission Plan (filed January 30, 2026); TEP 2026-2035 Ten-Year Transmission Plan (filed January 30, 2026); UNS Electric 2026-2035 Ten-Year Transmission Plan (filed January 30, 2026); SRP 2026-2035 Ten Year Plan (filed January 29, 2026); SRP supplement to the 2026-2035 Ten Year Plan (filed August 13, 2026); Arizona G&T Cooperatives 2026-2035 Ten Year Plan (filed January 30, 2026). Retrieved 2026-11-20; records reviewed by hand 2026-11-20.