Owl Head Ranch
In the Tucson Electric Power ten-year transmission plan filed with the Arizona Corporation Commission.
Described as new. The quoted wording calls this substation proposed or future. “Planned Owl Head Ranch 138-kV Switchyard” — TEP 2026-2035 Ten-Year Transmission Plan, p.55
Also mentioned: “Planned Owl Head Ranch 138-kV Switchyard” — TEP 2026-2035 Ten-Year Transmission Plan, p.56
No county is printed for this substation in the plan or in a Line Siting Committee docket found for it.
Location
Pima County, AZ
County only. A source prints the county; no point is published. This is where planning documents put the substation, not a surveyed or built site, and a planned site can move.
How it was located: No point. The CEC approves a siting area, not a site: "The siting area for the Owl Head Ranch Switchyard extends 1,000 feet southwest of the existing TEP quad circuit ... and 2,000 feet northwest and 2,000 feet southeast of Owl Head Ranch Road"; Exhibit A draws it as a hatched area, not a station symbol. The application: "located on state land on approximately 15 acres, east of I-10 on Owl Head Ranch Road". The hatched siting area lies south of the Pima/Pinal county line drawn on the same map.
Sources: Tucson Electric Power, Ten Year Plan 2026-2035, Transmission Projects (filed with the Arizona Corporation Commission, image E000049050) (plan years 2026-2035), p.55 · Tucson Electric Power, Ten Year Plan 2026-2035, Transmission Projects (filed with the Arizona Corporation Commission, image E000049050) (plan years 2026-2035), p.56 · ACC eDocket, Line Siting docket L-00000C-25-0094-00246 (Case No. 246): Northwest Marana Reliability Project (n/a (retrieved 2026-11-20)), docket description · TEP CEC Application, Northwest Marana Reliability Project (Case No. 246) (filed 2025-05-02), PDF p.21 · Line-Siting Certificate of Environmental Compatibility, Case No. 246 (Northwest Marana Reliability Project), with Exhibit A map (docketed 2025-06-25), pp.2-5; p.16 · BLM PLSS CadNSDI, section polygons (with Census TIGERweb county polygons) (n/a (retrieved 2026-11-20)), layer 2. Researched by Substation Scout; checked November 21, 2026.
The project in the plan
| Project | Where in the plan | Line siting case |
|---|---|---|
| Loop-in of Tortolita - Planned Grier into Planned Owl Head Ranch 138-kV Switchyard | p.55 | Case No. 246 |
Generation interconnection requests filed in Pima, AZ: APS queue, 2 active of 2. Same county, not the same substation.
Source: the utilities’ ten-year transmission plans filed with the Arizona Corporation Commission under A.R.S. 40-360.02, docket E-99999A-25-0006: APS 2026-2035 Ten Year Transmission Plan (filed January 30, 2026); TEP 2026-2035 Ten-Year Transmission Plan (filed January 30, 2026); UNS Electric 2026-2035 Ten-Year Transmission Plan (filed January 30, 2026); SRP 2026-2035 Ten Year Plan (filed January 29, 2026); SRP supplement to the 2026-2035 Ten Year Plan (filed August 13, 2026); Arizona G&T Cooperatives 2026-2035 Ten Year Plan (filed January 30, 2026). Retrieved 2026-11-20; records reviewed by hand 2026-11-20.
Before relying on any of this
- No Arizona ten-year plan prints a county for a substation. A county shown here is printed for that station in the plan or in a Line Siting Committee docket; otherwise it is left blank.
- The plans are scanned images with an OCR text layer. Quotes are copied from that layer; where it misspells a name, the page says so.
- An in-service date is the year the plan prints, not a construction schedule.