In the Arizona Public Service ten-year transmission plan filed with the Arizona Corporation Commission.

—county (not printed)
230, 69kV as printed
APSutility plan
2027in service, as printed

Described as new. The quoted wording calls this substation new. “this new 230/69kV source substation will reduce loading constraints” — APS 2026-2035 Ten Year Transmission Plan, p.28

The same project sheet (p.28) prints "Point of Termination Outer Circle substation (in-service 2027)" for this line, and the RMR study (p.78) lists "Outer Circle 230/69kV Substation".

Also mentioned: “The line will terminate at the Outer Circle substation, which will be located on the southeast corner of the 235th Avenue alignment and Grand Avenue, northwest of the City of Surprise.” — APS 2026-2035 Ten Year Transmission Plan, p.28 · “Sun Valley to Outer Circle 230kV Line and Outer Circle 230/69kV Substation” — APS 2026-2035 Ten Year Transmission Plan, p.78 · “Point of Termination Outer Circle substation (in-service 2027)” — APS 2026-2035 Ten Year Transmission Plan, p.37

Note. The plan gives the purpose as "To provide electric energy to growing load demands in the northwest Surprise and Wittmann areas, including proposed new logistics and industrial loads."

No county is printed for this substation in the plan or in a Line Siting Committee docket found for it.

Location

33.8078, -112.5670 · Maricopa County, AZ · view on a map

Parcel or address in a filing. A filing names the parcel or address; the point is its center. Accurate to about ±400 m, as estimated by the research. This is where planning documents put the substation, not a surveyed or built site, and a planned site can move.

How it was located: Printed corner: "the Outer Circle substation, which will be located on the southeast corner of the 235th Avenue alignment and Grand Avenue, northwest of the City of Surprise" (plan pp.28 and 37). OSM: US 60 Grand Avenue (Wickenburg-Phoenix Highway) crosses the 235th Avenue alignment (N 235th Avenue, -112.5683) at about 33.8090, -112.5683; the point is set ~150 m south-east of that crossing, inside the south-east corner. Site size not printed, so ±400 m. Fit: the Sun Valley-Morgan 500 kV line, whose open circuit position the new 230 kV line uses, turns north onto the 235th Avenue alignment at 33.7753 and runs north toward Grand Avenue (OSM way 1023899083).

County: the Census county at this point.

Sources: APS 2026-2035 Ten Year Transmission Plan (Arizona Public Service Company), ACC Docket E-99999A-25-0006 (A.R.S. 40-360.02 ten-year plans) (filed 2026-01-30), p.28 · APS CEC 138 (Sun Valley (TS-5) to Morgan (TS-9) 500kV/230kV) annual compliance filing, Decision No. 70850, Docket L-00000D-08-0330-00138 (filed 2026-11-10), p.2 · OpenStreetMap: US 60 Grand Avenue, N 235th Avenue, Sun Valley - Morgan 500KV line (OSM base 2026-11-21). Map data © OpenStreetMap contributors, available under the Open Database License. Researched by Substation Scout; checked November 21, 2026.

The project in the plan

ProjectWhere in the planLine siting case
Sun Valley to Outer Circle 230kV Linep.28CEC 138

Generation interconnection requests filed in Maricopa, AZ: APS queue, 82 active of 259. Same county, not the same substation.

Source: the utilities’ ten-year transmission plans filed with the Arizona Corporation Commission under A.R.S. 40-360.02, docket E-99999A-25-0006: APS 2026-2035 Ten Year Transmission Plan (filed January 30, 2026); TEP 2026-2035 Ten-Year Transmission Plan (filed January 30, 2026); UNS Electric 2026-2035 Ten-Year Transmission Plan (filed January 30, 2026); SRP 2026-2035 Ten Year Plan (filed January 29, 2026); SRP supplement to the 2026-2035 Ten Year Plan (filed August 13, 2026); Arizona G&T Cooperatives 2026-2035 Ten Year Plan (filed January 30, 2026). Retrieved 2026-11-20; records reviewed by hand 2026-11-20.