In the Arizona Electric Power Cooperative ten-year transmission plan filed with the Arizona Corporation Commission.

—county (not printed)
69kV as printed
AEPCOutility plan
October 2026in service, as printed

Described as new. The quoted wording calls this substation new. “Mohave Valley 69 kV Substation (f/k/a Phase 1 of Mohave Energy Center 69 kV Substation): New 69 kV substation to accommodate new generation and interconnection in the Mohave Electric Cooperative, Inc. (MEC) 69 kV transmission area. (October 2026)” — Arizona G&T Cooperatives 2026-2035 Ten Year Plan, p.8

Also mentioned: “New 69 kV substation to accommodate new generation and interconnection in the MEC 69 kV transmission area. (October 2026)” — Arizona G&T Cooperatives 2026-2035 Ten Year Plan, p.41 · “2026 -Mohave Valley 69 kV Substation” — Arizona G&T Cooperatives 2026-2035 Ten Year Plan, p.38

Note. 69 kV is below the 115 kV scope of the ten-year plan statute (A.R.S. 40-360.02); AEPCO lists it anyway.

Note. The plan says it was formerly known as "Phase 1 of Mohave Energy Center 69 kV Substation".

Note. Purpose as printed: "to accommodate new generation and interconnection". "Mohave" here is the Mohave Electric Cooperative's name, not a county.

No county is printed for this substation in the plan or in a Line Siting Committee docket found for it.

The project in the plan

ProjectWhere in the planLine siting case
Mohave Valley 69 kV Substationp.8Not printed

Source: the utilities’ ten-year transmission plans filed with the Arizona Corporation Commission under A.R.S. 40-360.02, docket E-99999A-25-0006: APS 2026-2035 Ten Year Transmission Plan (filed January 30, 2026); TEP 2026-2035 Ten-Year Transmission Plan (filed January 30, 2026); UNS Electric 2026-2035 Ten-Year Transmission Plan (filed January 30, 2026); SRP 2026-2035 Ten Year Plan (filed January 29, 2026); SRP supplement to the 2026-2035 Ten Year Plan (filed August 13, 2026); Arizona G&T Cooperatives 2026-2035 Ten Year Plan (filed January 30, 2026). Retrieved 2026-11-20; records reviewed by hand 2026-11-20.