Kipper

In the UNS Electric ten-year transmission plan filed with the Arizona Corporation Commission.

—county (not printed)
138kV as printed
UNSEutility plan
2026in service, as printed

Described as new. The quoted wording calls this substation proposed or future. “Planned Kipper 138-kV Substation” — UNS Electric 2026-2035 Ten-Year Transmission Plan, p.22

Also mentioned: “Planned Kipper 138-kV Substation” — UNS Electric 2026-2035 Ten-Year Transmission Plan, p.24

Note. The plan says Kipper will be located approximately 1 mile south of the Sonoita substation.

No county is printed for this substation in the plan or in a Line Siting Committee docket found for it.

Location

Santa Cruz County, AZ

County of the area the plan places it in. No source prints a location. The plan places the substation relative to a mapped feature, and everywhere within that range is in one county. No point is published. This is where planning documents put the substation, not a surveyed or built site, and a planned site can move.

How it was located: No point: a distance from a named neighbour is not a point. Not in OSM or HIFLD by name.

Note: The plan names an existing "Sonoita" substation that HIFLD and OSM place near Rio Rico (31.4677 N, 110.9747 W), not in the community of Sonoita (31.68 N, 110.65 W). Both lie in Santa Cruz County, so the county holds either way, but a reader expecting Kipper near the town of Sonoita would be ~25 km off.

County: the plan prints “approximately 1 mile south of the Sonoita substation”. The existing Sonoita substation it is measured from is in Santa Cruz County, and all land within 5 km of it is too (Census TIGERweb).

Sources: UNS Electric 2026-2035 Ten-Year Transmission Plan (UNS Electric, Inc.; includes the Nogales Transmission, LLC section), ACC Docket E-99999A-25-0006 (filed 2026-01-30), p.22 · OpenStreetMap: Sonoita Substation (UniSource Energy Services) and substations near Rio Rico (OSM base 2026-11-21). Map data © OpenStreetMap contributors, available under the Open Database License. Researched by Substation Scout; checked November 21, 2026.

The project in the plan

ProjectWhere in the planLine siting case
Loop-In of Existing Sonoita - Valencia 138-kV Transmission Line into Planned Kipper 138-kV Substationp.22Not printed

Source: the utilities’ ten-year transmission plans filed with the Arizona Corporation Commission under A.R.S. 40-360.02, docket E-99999A-25-0006: APS 2026-2035 Ten Year Transmission Plan (filed January 30, 2026); TEP 2026-2035 Ten-Year Transmission Plan (filed January 30, 2026); UNS Electric 2026-2035 Ten-Year Transmission Plan (filed January 30, 2026); SRP 2026-2035 Ten Year Plan (filed January 29, 2026); SRP supplement to the 2026-2035 Ten Year Plan (filed August 13, 2026); Arizona G&T Cooperatives 2026-2035 Ten Year Plan (filed January 30, 2026). Retrieved 2026-11-20; records reviewed by hand 2026-11-20.