Hazen
In the Arizona Public Service ten-year transmission plan filed with the Arizona Corporation Commission.
Described as new. The quoted wording calls this substation proposed or future. “the location of the future Hazen 230/69kV substation” — APS 2026-2035 Ten Year Transmission Plan, p.43
Also mentioned: “the Panda-Freedom 230kV line will be cut into the Hazen substation, to be located at the northwest corner of Hazen Road and the 255th Avenue alignment in Buckeye.” — APS 2026-2035 Ten Year Transmission Plan, p.40 · “Hazen 230/69kV Substation” — APS 2026-2035 Ten Year Transmission Plan, p.79
Note. No CEC application filed for the line that serves it (plan p.40).
No county is printed for this substation in the plan or in a Line Siting Committee docket found for it.
Location
33.3570, -112.6008 · Maricopa County, AZ · view on a map
Parcel or address in a filing. A filing names the parcel or address; the point is its center. Accurate to about ±400 m, as estimated by the research. This is where planning documents put the substation, not a surveyed or built site, and a planned site can move.
How it was located: Printed corner: "The Hazen substation property is located at the northwest corner of Hazen Road and the 255th Avenue alignment in Buckeye" (plan p.43; also p.40). OSM: W Hazen Road meets the 255th Avenue alignment (S 255th Avenue, -112.5995) at 33.35590, -112.59945; the point is set ~120 m north and ~120 m west of that corner, inside the northwest quadrant. The property's size is not printed, so ±400 m. Corroborated by APS's Cotton Transmission Corridor map, whose green Future Substation triangle "Hazen - 230kV" reads at 33.3569, -112.5995 on an affine fit to the Freedom, Jojoba and Rudd substation symbols (1:225,000; check residuals 250-550 m).
County: the Census county at this point.
Sources: APS 2026-2035 Ten Year Transmission Plan (Arizona Public Service Company), ACC Docket E-99999A-25-0006 (A.R.S. 40-360.02 ten-year plans) (filed 2026-01-30), p.43 · APS Cotton Transmission Corridor Siting Project, open house boards (Conceptual Connections map, SWCA, 1:225,000) (March 2025 (map modified 3/18/2025)), PDF p.4 · APS, Cotton Transmission Corridor 500kV/230kV project page (n/a (retrieved 2026-11-20)), project description · OpenStreetMap: W Hazen Road and S 255th Avenue, Buckeye (OSM base 2026-11-21). Map data © OpenStreetMap contributors, available under the Open Database License. Researched by Substation Scout; checked November 21, 2026.
The project in the plan
| Project | Where in the plan | Line siting case |
|---|---|---|
| Panda to Freedom 230kV New Line #2 | p.40 | Not printed |
Generation interconnection requests filed in Maricopa, AZ: APS queue, 82 active of 259. Same county, not the same substation.
Source: the utilities’ ten-year transmission plans filed with the Arizona Corporation Commission under A.R.S. 40-360.02, docket E-99999A-25-0006: APS 2026-2035 Ten Year Transmission Plan (filed January 30, 2026); TEP 2026-2035 Ten-Year Transmission Plan (filed January 30, 2026); UNS Electric 2026-2035 Ten-Year Transmission Plan (filed January 30, 2026); SRP 2026-2035 Ten Year Plan (filed January 29, 2026); SRP supplement to the 2026-2035 Ten Year Plan (filed August 13, 2026); Arizona G&T Cooperatives 2026-2035 Ten Year Plan (filed January 30, 2026). Retrieved 2026-11-20; records reviewed by hand 2026-11-20.
Before relying on any of this
- No Arizona ten-year plan prints a county for a substation. A county shown here is printed for that station in the plan or in a Line Siting Committee docket; otherwise it is left blank.
- The plans are scanned images with an OCR text layer. Quotes are copied from that layer; where it misspells a name, the page says so.
- An in-service date is the year the plan prints, not a construction schedule.