Harshaw

In the UNS Electric ten-year transmission plan filed with the Arizona Corporation Commission, in Santa Cruz County.

Santa Cruzcounty
138kV as printed
UNSEutility plan
2027in service, as printed

Described as new. The quoted wording calls this substation proposed or future. “Planned Harshaw Substation” — UNS Electric 2026-2035 Ten-Year Transmission Plan, p.23

Also mentioned: “Planned Harshaw Substation” — UNS Electric 2026-2035 Ten-Year Transmission Plan, p.32

Note. The plan routes the line "to the Hermosa Mine and the planned Harshaw Substation" and calls it a network upgrade associated with an interconnection request to serve a future load.

Note. A 175 MVAR static var compensator at Harshaw (p.32) is planned for 2027.

County: “Originating at the Planned Rio Rico Switchyard (Section 12, Township 23 S, Range 13 E) and Terminating at the Planned Harshaw Substation (Section 32, Township 22 S, Range 16 E), Each Located within Santa Cruz County, Arizona.” — ACC eDocket, Line Siting docket L-00000F-23-0060-00218, docket description, retrieved 2026-11-20.

Location

31.4734, -110.7313 · Santa Cruz County, AZ · view on a map

Read off a planning map. Read off a planning map by matching it to roads and other mapped features. Accurate to about ±250 m, as estimated by the research. This is where planning documents put the substation, not a surveyed or built site, and a planned site can move.

How it was located: Symbol anchored: the blue triangle labelled "Proposed Harshaw Substation" (legend: "Proposed Harshaw Substation") on the CEC's Exhibit A map (rotated, north to the left; 150 dpi, 16.76 m/px from the scale bar). Anchors: the T22S/T23S township line drawn just south of the symbol (31.4712 in R16E, BLM PLSS) and the R15E/R16E range line (west edge of Section 31, T22S R16E = -110.7584, BLM). Independent check on Exhibit B, which draws the same triangle inside its "T22S-R16E-32" section box: 85% of the way south and 38% west in the box gives 31.4734, -110.7311 (40 m apart). Both reads put it in the SE quarter of Section 32, as Exhibit B prints ("500' corridor in the SE quadrant of Section 32"). ±250 m (map scale and symbol size).

Note: The CEC caption prints "HARSHAW SUBSTATION (SECTION 5, TOWNSHIP 23 SOUTH, RANGE 16 EAST)" while the docket description and the CEC's own Exhibit B put it in Section 32, Township 22 South (the section directly north). Both maps draw it north of the township line, in Section 32. Both sections lie wholly in Santa Cruz County.

Sources: UNS Electric 2026-2035 Ten-Year Transmission Plan (UNS Electric, Inc.; includes the Nogales Transmission, LLC section), ACC Docket E-99999A-25-0006 (filed 2026-01-30), p.23 · ACC Line Siting Case No. 218 (Docket L-00000F-23-0060-00218), Certificate of Environmental Compatibility, Rio Rico to Harshaw 138 kV Transmission Line Project, Exhibit A (Preferred and Alternative Routes) and Exhibit B (Approved CEC Corridor) (docketed 2023-04-25 (Commission Decision No. 79005…), caption p.1; route p.3; Exhibit A p.15; Exhibit B p.16 · ACC eDocket, Docket L-00000F-23-0060-00218 description (filed 2023-03-03), docket description · BLM PLSS CadNSDI section polygons (Sec 32, T22S, R16E; Sec 5, T23S, R16E; Sec 31, T22S, R16E), counties intersecting each section from Census TIGERweb State_County (n/a (queried 2026-11-20)), layer 2. Researched by Substation Scout; checked November 21, 2026.

The project in the plan

ProjectWhere in the planLine siting case
Planned Rio Rico Switchyard - Planned Harshaw 138-kV Transmission Linep.23Case No. 218

Source: the utilities’ ten-year transmission plans filed with the Arizona Corporation Commission under A.R.S. 40-360.02, docket E-99999A-25-0006: APS 2026-2035 Ten Year Transmission Plan (filed January 30, 2026); TEP 2026-2035 Ten-Year Transmission Plan (filed January 30, 2026); UNS Electric 2026-2035 Ten-Year Transmission Plan (filed January 30, 2026); SRP 2026-2035 Ten Year Plan (filed January 29, 2026); SRP supplement to the 2026-2035 Ten Year Plan (filed August 13, 2026); Arizona G&T Cooperatives 2026-2035 Ten Year Plan (filed January 30, 2026). Retrieved 2026-11-20; records reviewed by hand 2026-11-20.