Substation Scout

Gateway

In the UNS Electric ten-year transmission plan filed with the Arizona Corporation Commission, in Santa Cruz County.

Santa Cruzcounty
138, 230kV as printed
UNSEutility plan
TBDin service, as printed

Described as new. The quoted wording calls this substation proposed or future. “the future Gateway substation which will be the site of a DC converter station” — UNS Electric 2026-2035 Ten-Year Transmission Plan, p.39

Also mentioned: “Future Gateway Substation” — UNS Electric 2026-2035 Ten-Year Transmission Plan, p.34 · “TEP Vail 138-kV Substation to planned Gateway” — UNS Electric 2026-2035 Ten-Year Transmission Plan, p.38

Note. Part of the Nogales Interconnection Project, which the plan describes as an AC/DC/AC interconnection with Mexico; the 230-kV line is printed in the plan's Nogales Transmission, LLC section and would be owned and constructed by Nogales Transmission.

Note. All Gateway projects are conceptual in the plan (in service TBD).

County: “a new approximately two-mile 230-kV transmission line and associated facilities in Santa Cruz County to interconnect the proposed Gateway Substation to the Mexican National Electric System.” — ACC eDocket, Line Siting docket L-00000F-17-0246-00176, docket description, retrieved 2026-11-20.

Location

31.3604, -110.9673 · Santa Cruz County, AZ · view on a map

Point published by the utility. The utility publishes this point, on a project map or in a filing. Accurate to about ±300 m, as estimated by the research. This is where planning documents put the substation, not a surveyed or built site, and a planned site can move.

How it was located: Printed by the CEC's legal description (Exhibit A): the 138 kV centerline ends at "the terminus of said centerline near Gateway Substation, said terminus having a grid coordinate of (X)996,336.570, (Y)132,345.064" of the Arizona State Plane Central Zone (NAD83, feet). Converted with the zone's Transverse Mercator parameters (origin 31 N, 111 55' W, k 0.9999, false easting 700,000 ft); the same conversion puts the 230 kV centerline's border terminus at 31.3327 N, on the US-Mexico border, which checks the zone and units. The point is in "Section 12, Township 24 South, Range 13 East", where the CEC locates the substation (BLM: 31.3485-31.3631 N, 110.977-110.960 W). It is the line's end "near" the station, not the station's own point; ±300 m allows for the yard (two Gateway substations and a DC converter on one site).

Sources: UNS Electric 2026-2035 Ten-Year Transmission Plan (UNS Electric, Inc.; includes the Nogales Transmission, LLC section), ACC Docket E-99999A-25-0006 (filed 2026-01-30), p.39 · ACC Line Siting Case No. 176 (Docket L-00000F-17-0246-00176), Certificate of Environmental Compatibility, Nogales Interconnection Project and UNSE Nogales Tap to Kantor Upgrade Project, with Exhibit A legal description (docketed 2017-09-22 (Commission Decisions No. 76468 and…), p.3 · ACC eDocket, Docket L-00000F-17-0246-00176 description (filed 2017-07-27), docket description · BLM PLSS CadNSDI section polygons (Sec 12, T24S, R13E), counties intersecting each section from Census TIGERweb State_County (n/a (queried 2026-11-20)), layer 2. Researched by Substation Scout; checked November 21, 2026.

The project in the plan

ProjectWhere in the planLine siting case
230-kV Transmission Line from Future Gateway Substation to US / Mexico borderp.39Case No. 176

Source: the utilities’ ten-year transmission plans filed with the Arizona Corporation Commission under A.R.S. 40-360.02, docket E-99999A-25-0006: APS 2026-2035 Ten Year Transmission Plan (filed January 30, 2026); TEP 2026-2035 Ten-Year Transmission Plan (filed January 30, 2026); UNS Electric 2026-2035 Ten-Year Transmission Plan (filed January 30, 2026); SRP 2026-2035 Ten Year Plan (filed January 29, 2026); SRP supplement to the 2026-2035 Ten Year Plan (filed August 13, 2026); Arizona G&T Cooperatives 2026-2035 Ten Year Plan (filed January 30, 2026). Retrieved 2026-11-20; records reviewed by hand 2026-11-20.

Before relying on any of this

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first