TUCO substation interconnection queue

5 active projects totaling 1,057.1 MW in the SPP queue, plus 6 with terminal status (shown grayed).

11 SPP queue filings name TUCO as the point of interconnection, all in TX.

5active projects
1,057.1active MW
11total filed
Queue IDProjectkVMWResourceStatus
GEN-2012-020 Not reported 230 478 Wind Operational
GEN-2015-068 Not reported 345 300 Wind Withdrawn
GEN-2010-034 Not reported 345 261 Wind Withdrawn
GEN-2010-033 Not reported 345 230 Wind Withdrawn
GEN-2010-032 Not reported 345 216 Wind Withdrawn
GEN-2012-037 Not reported 345 203 Gas Operational
GEN-2013-016 Not reported 345 203 Gas Operational
GEN-2006-018 Not reported 230 168.1 Gas Operational
GEN-2017-059 Not reported 230 90 Solar Withdrawn
GEN-2010-046 Not reported 230 56 Gas Withdrawn
GEN-2015-041 Not reported 345 5 Gas Operational

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.