Substation Scout

Mathewson substation interconnection queue

2 active projects totaling 998.2 MW in the SPP queue, plus 2 with terminal status (shown grayed).

4 SPP queue filings name Mathewson as the point of interconnection, all in Cimarron County, OK.

2active projects
998.2active MW
4total filed
Queue IDProjectkVMWResourceStatus
GEN-2016-045 Not reported 345 499.1 Wind Operational
GEN-2016-057 Not reported 345 499.1 Wind Operational
GEN-2017-159 Not reported 345 350 Wind Withdrawn
GEN-2017-160 Not reported 345 350 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first