SPP request GEN-2016-045

SPP queue ID GEN-2016-045

Queue request GEN-2016-045 was listed in the SPP interconnection queue at the end of 2025 as a 499.1 MW wind project in Cimarron County, OK, according to Berkeley Lab’s queue data file. The filing names Mathewson as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of March 18, 2022.

Queue IDGEN-2016-045
Project nameNot reported
Status (as published)Operational
SubstationMathewson
Point of interconnectionMathewson 345kV
CountyCimarron
StateOK
Voltage345 kV
Capacity499.1 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Proposed online date2022-03-18
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Mathewson substation: 4 requests in the SPP queue, 2 active totaling 998.2 MW.

Queue IDProjectMWResourceStatus
GEN-2016-057Not reported499.1WindOperational
GEN-2017-159Not reported350WindWithdrawn
GEN-2017-160Not reported350WindWithdrawn

Cimarron, OK: 7 requests in the SPP queue, 2 active totaling 998.2 MW.

Tracked changes

Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityOGE
ClusterDISIS-2016-001-3; 04 SOUTHEAST
Interconnection serviceERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)IA FULLY EXECUTED/COMMERCIAL OPERATION
Queue date2016-03-31
Operational date2022-03-18

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first