Substation Scout

SPP request GEN-2025-SR29

SPP queue ID GEN-2025-SR29

Queue request GEN-2025-SR29 was listed in the SPP interconnection queue at the end of 2025 as a 75 MW battery project in Lea County, NM, according to Berkeley Lab’s queue data file. The filing names T14 Circuit as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of March 1, 2027.

Queue IDGEN-2025-SR29
Project nameNot reported
Status (as published)Active
SubstationT14 Circuit
Point of interconnectionT14 Circuit 115kV
CountyLea
StateNM
Voltage115 kV
Capacity75 MW
Resource (as published)Battery
Resource categoryBattery (normalized for filtering)
Proposed online date2027-03-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Lea, NM: 78 requests in the SPP queue, 22 active totaling 4,552 MW.

Tracked changes

Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilitySPS
ClusterSurplus; 05 SOUTHWEST
Interconnection serviceERIS
Project typeSurplus
Study phase (standardized by Berkeley Lab)IA Pending
Study phase (as the queue printed it)IA PENDING
Queue date2025-08-18

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.